Loading...
RES NO 05-03-2023 City of Vail Buren, Arkansas Complex Municipal 1003 Broadway • Van Buren, Arkansas 72956 Resolutiono'5 -6 5- ���� Has been AMENDED as of Please refer to Resolution O1 - D -3 -c�OoQ S Shawnna M. Reynolds City Clerk-Treasurer ti • t CITY OF VAN BUREN,ARKANSAS RESOLUTION NO.a6:-1�6 2023 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS, A RESOLUTION TO BE ENTITLED: A RESOLUTION ACCEPTING THE BID OF STEVE BEAM CONSTRUCTION, INC., FOR 2023 STREET IMPROVEMENTS; AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren has advertised for bids for the 2023 Street Improvements through Hawkins-Weir Engineers, Inc.; and WHEREAS, bids have been received and opened in accordance with Arkansas law and Steve Beam Construction, Inc., is the lowest bidder meeting the bid specifications. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN,ARKANSAS,THAT: SECTION 1: The City of Van Buren, Arkansas accepts the bid of$1,129,654.00, for the 2023 Street Improvements, as set forth in 'Exhibit A" attached hereto. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to pay all street improvement expenses,not to exceed the amounts of the low bids submitted, as set forth in"Exhibit A"attached hereto. IN WITNESS WHEREOF,the City_of Van Buren,Arkansas,by its City Council, did pass, approve, and adopt,by a vote of a for and Q against,the foregoing Resolution at its regular meeting held on the 22nd day of May 2023. G�erk Tre City of Van B J h P. Hurst Buren a ATTESTED: d °r ��,a�`ymy APPROVED AS TO FORM: aCounty,F —3DZ0,Lad �— Shawnna Reyno J cob Howel City Clerk/Treasurer City ttorney r �-, ���ti111111rr�� r �r��, ''' y to �''y► • r ��'��'lYrtI1I111 t y .. ............................. Exhibit A ........... ....... ...................... HAWKINS ,6WEIR E1'N111G IN EE Rq.. INC. Engln.Lierinq!Client-success May 16,2023 Honorable Joseph Hurst, Mayor City of Van Buren,Arkansas 1003 Broadway Van Buren,Arkansas 72956 Re: 2023 Street Improvements Vag Buren,Arkansas HWEI'Pro. ject No.2022027 Dear Mayor Hurst: Two (2) bids were received on Thursday, May 44, 2023,for the referenced project, however the bid from Crawford Construction, Inc. is considered as Non-Responsive as they failed to acknowledge Addendum No. I per Contract Documents. Enclosed is a copy of the certified bid tabulation. The low bid for Scheduled was submitted by Steve Beam Construction,Inc.for a total contract price of,$1,236,427.00. The low bid for Schedule If was submitted by Steve Beam Construction,Inc. for a total contract price of$1,129,664.110- The total contract price,Including Schedule I and Schedule 11,is$2,366,081.00. This low bid is Jess than the engineer's estimate of$2,441,952.50. We are aware that the low bid for the total project consisting of both Schedule 1,and Schedule If is greater than the amount of funds available for this project, therefore we recommend that a construction contract for Schedule if only be awarded to the low bidder, Steve Beam Construction, Inc.,for a total contract price.of$1,129,664.00. We understand that you will present these bids and our recommendation to the City Council for their consideration during the May 2023 meeting. If-you have anyv questions,or comments., please do ript.hl .ita F6 to pall. Sincerely yours, HAWKINS-WEIR ENGINEERS, INC. JKS/mcw J. Kyle Salyer., P.E.,P.S. Enclosure., Certified Bid-Tabulation Tabulation.. 0 page) -cc: Mr.John Ka.r.stens,City of Van Buren FiX--,(479)47-4-$531 F'iye1fL;vflh* AR,72-703 * Ph':(479)4_5J5-2-2Q6- 72901 0 Ph:(4-7�):'242405 .........................- City of Van Buren,Arkansas 2023 Street Improvements Tabulation of Bids Received on May 11,2023 "WEI Project No.2023001 SCHEDULE 11 2023 Street Improvements Engineees Estimate Steve Beam Construction.,loci COMfood Fo-nsiruction Item#' Description T! � C6mpaqy,Ins., CITY 140, Unit Cost Bid Unit cost 131d, Cuor' 1. ftrfotnisnce&Payment Bond. Frected Non-Res onsive p LS $28iQDO.DD $28,000., Z Maintenance of Traffic&Trafric.Control $11,000.00 $11jonoo I LS $45,0010m $4$1000.00 W,OM.00 $60,00.0.00 Construction Erosion Control, I LS $35000-00 $35,06UD A- Site Preparation 1775.00 $775.UO I LS $1%000.00 $11 5,000too $11,00.00 $11,000,00 5. Excavation and Trench Safety System 1, 09 $2.600.()0 $2,600.00 $1,00 $1.00 6, Flqwable Fill 45 CY $2004D $9.'000.0c $06.00 $19125,00 Solid Sodding 460 SY $12i00 $$.40011. $21.00 $9,450.00 Prime,Coat,or Took Oil 1,690 GAL $8,460.00 $5.00 $8,450.00 Eriffinates;Estimate Steve Bea, Unit Cost ZO'0()0.00 $28'000.0 $11,000.01) U$ Of J0.00 sa, 45 nm n P. ACHM Surfabecouese(Type;3)-(2"Thickness) 1A00 TON $180-00 $342,000.00 $1,31.00 $248 900,00 Cold Milling AsphalyConcrete Pavement 11,800 SY $12-00 $141,600.00 $11-00 $129,800.00 Deep Patch 4;400 SY .$80,00 $352,000;00 $103.00 $463,200.00 U, Concrete Pgvemon.tApron(61"Thickness) 630 Sy $120.00 7$ U06.00 $1,15.00 $72,450.00 13. Concrete DriveWay(6�'Thlckness) 18 SY $95.00 $1,71..0F.00 1.5.4; '18"RCP Class III 1 C 3P5 LF $126,00 $44,37-6.00 $124,0.0 $44,020.00 onceete Inlets&Junction Boxes 2a OY $2.600.()0 $67,500.00 $1.865.00 $42,895.00 16. Manhole Frame and Cover :6 EA $700.00 $3,500;00 $750.00 $3,760,00 11, Combination Grated Frame and Cover I EA $1,500.00 $1,500.00 $75MO $750.00 18. Manhole Grade Adjustment(Grade Rings) I EA $800.100 $800 Od $75D,00 $750.00 99. Thermoplastic PElvemOnI.Matkitig(Yellowil") 9,000 LF $1 w $13,500.00 $1.20 $10,800.00 20. Thermoplastic Pavement Marking(White 12") LF $k.00 $90.0i0o $1200 $54000 IFOTAL 810-SCHEDULE 11 I - 1 46 $1,203i336.00 $111291564 00 Mon-Responsivel I hereby certify that this tabulation Is a true,, 0116-A rate representation of all bids received. lot A R "'ki J,Kyle Salyer,! .P.,P'S' 'k, tTEEC % Hawkins�Welt Engineers, Inc. C AL E -Arkansas License No,1.2036 ENGINEER kYLE Sept-lip/dZ0 20230011Certifidd Bid Tab 051123 Page 1 of 1 ..........