Loading...
RES NO 10-04-2021 CITY OF VAN BUREN,ARKANSAS RESOLUTION NO.!v -Oq -2021 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS,A RESOLUTION TO BE ENTITLED: A RESOLUTION AUTHORIZING THE MAYOR TO AMEND THE CONTRACT FOR THE NORTH 2OTH STREET AND ' MAPLE STREET OVERLAY PROJECT. WHEREAS, Goodwin and Goodwin, Inc. was approved by the Van Buren City Council to start the North 20t'Street and Maple Street Overlay Project,pursuant to Ark. Code Ann. Section 19-11-801,and the Council further authorized the Mayor and City Clerk to enter into an agreement with Goodwin and Goodwin,Inc.to provide those services;and WHEREAS, an agreement with Goodwin and Goodwin,Inc.was entered into;and WHEREAS, three separate change orders to the initial agreement have been submitted totaling $264,445.00. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS,THAT: SECTION 1: The Mayor and City Clerk are hereby authorized to execute change orders not to exceed $264,445.00 as set forth in Exhibit "A" hereto, and to pay all expenses relating to this project in accordance with the change orders and the original agreement. IN WITNESS WHEREOF,the City of Van Buren,Arkansas,by its City Council,did pass, approve, and adopt,by a vote of to for and 0 against,the oregoing Resolution at its regular meeting held on the 25�'day of October 2021. ` J eph . urst ATTESTED: APPROVED AS TO FORM: Y Ph lhs Thomas aco Howell City Clerk/Treasurer City Attorney CHANGE ORDER NO,: One(1) DATE: 10-May 21 CONTRACT DATE: 19-Apr-21 ENGINEER'S PROJECT NO.: 2020003 NAME OF PROJECT: NORTH 2OTH STREET AND MAPLE STREET IMPROVEMENTS OWNER: CITY OF VAN BUREN,ARKANSAS CONTRACTOR: GOODWIN&GOODWIN.INC. THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS: The following items are added to Schedule 1 of the Project. Item Quantity Unit Amount No, Description and Unit Price of Change 6. Remove&Disposal of Concrete Driveway&Sidewalk 85 SY S15,00 $1,275.00 T. Remove 8,Disposal of Curb and Gutter 140 LF $12.00 $1,680.00 17. Curb&Gutter(Type"A") 140 LF $24.00 $3,360.00 20. Concrete Driveway(5"Thickness) 30 SY $60.00 $1,800.00 22, Concrete Sidewalk(4"Thickness) 55 SY $50.00 $2,750.00 42' Rock Excavation 180 CY 5150.00 $27,000.00 43' Flowable Fill 20 CY $125.00 $2,500.00 44• Remove and Relocate Water Meter 1 EA $1,200.00 $1.200.00 ADD S41,565.00 TOTAL CHANGE ORDER NO,1 ADD JUSTIFICATION: This Change Order No.1 is warranted to compensate the Contractor for the removal and replacement of additional concrete curb and gutter,sidewalk,and driveways as requested by the Owner.This Chage Order will also compensate the Contractor(or Rock Excavation encountered during construction and Flowable fill backfill. This Change Order will aslo compensate the Contractor for additional work requested by the Owner including relocation of a water meter. An asterisk denoted by the change order unit Item identifies that the proposed unit price was provided by the Contractor during the construction phase of the Project, CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE $1,113,110.00 CURRENT CONTRACT PRICE ADJUSTED BY PREVIOUS CHANGE ORDERS $1,113,110.00 THE CONTRACT PRICE DUE TO THIS CHANGE ORDER WILL BE(INCREASED)(BESREASEB)BY $41,665.00 THE NEW CONTRACT PRICE INCLUDING THIS CHANGE ORDER WILL BE $1,154,675.00 20200031ConstructionlChange OrderslChange Order No,1.xis PAGE 1 OF 2 CHANGE ORDER NO.: One(1) DATE- 10•May21 CHANGE TO CONTRACT TIME: CONTRACT DATE: 19-Apr-21 THE CONTRACT TIME WILL BE(INCREASED (DEGREASED)BY 3Q_CALENDAR DAYS THE CONTRACT PERIOD INCLUDING THIS CHANGE ORDER SHALL BE 24Q_CALENDAR DAYS APPROVALS: ENGINEER: HAWKINS-WEI ENGINEERS,INC. Date 5 ` I Z ?,02/ CONTRACTOR: GOODWIN&GOO WIN,INC. By — � �y.�� Date OWNER: CITY OF VAN BUREN,ARKANSAS r 7 By o Dale 2020003Zonstruclion%hange Orders%hange Order No 1.xts PAGE 2 OF 2 CHANGE ORDER NO.: Two(2) DATE: 20-May-21 CONTRACT DATE: 19-Apr-21 ENGINEER'S PROJECT NO.: 2020003 NAME OF PROJECT: NORTH 2OTH STREET AND MAPLE STREET IMPROVEMENTS OWNER: CITY OF VAN BUREN,ARKANSAS CONTRACTOR; GOODWIN&GOODWIN,INC. THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS: The following items are added to Schedule 1 of the Project. Item Quantity Unit Amount No. Description and Unit Price of Change 15. Deep Patch 200 SY $45.00 S9,000.00 26. 18"RCP Class 111 22 LF $50.00 S11100.00 31. Grated Frame and Cover(Drainage) i EA S500.00 $500.00 45' Remove and Replace Sewer Service 2 EA $800.00 S1,600.00 46' Combination Inlet Grate(Single) 1 EA $2,600.00 $2,600.00 47' Concrete Ditch Paving(6"Thickness) 6 SY S100.00 $600.00 ADD $15,400.00 The following items are removed from Schedule 1 of the Project. Item Quantity Unit Amount No. Description and Unit Price of Change 27. 24"RCP Class 111 60 LF $75.00 $4,500.00 28. 24"RCP Flared End Section 1 EA $1,300.00 $1,300.00 SUBTRACT $5,800.00 TOTAL CHANGE ORDER NO.2 ADD JUSTIFICATION: This Change Order No.2 is warranted to compensate the Contractor for the changes to the alignment and materials of the drainage system between City Park Road and Parkview Street The changes were necessary to avoid conflicts with an existing gas line and an existing waterline. "An asterisk denoted by the change order unit Item identifies that the proposed unit price was provided by the Contractor during the construction phase of the Project. CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE $1,113.110.00 CURRENT CONTRACT PRICE ADJUSTED BY PREVIOUS CHANGE ORDERS $1,164,675.00 TH6 CONTRACT PRICE DUE TO THIS CHANGE ORDER WILL BE OW HE4SED ($EGREASEB)BY $9,600.00 THE NEW CONTRACT PRICE INCLUDING THIS CHANGE ORDER WILL BE $1,164,275.00 20200031C0nstruU1on\Ghange OrdorAChange Order No,2.09 PAGE 1 OF 2 CHANGE ORDER NO.: Two(2) DATE: 20-May-21 CHANGE TO CONTRACT TIME: CONTRACT DATE: 19-Apr-21 THE CONTRACT TIME WILL BE 11NCREASEDI(DEGREASED)BY o CALENDAR DAYS THE CONTRACT PERIOD INCLUDING THIS CHANGE ORDER SHALL BE 240 CALENDAR DAYS APPROVALS: ENGINEER AW1 NS-WEIR ENGINEERS,INC. By Date s' ZL CONTRACTOR: GOODWIN&GOODWIN,INC. By Date OWNER. CITY OF VAN BUREN,ARKANSAS By Date i 20200001ConstructlonlChange OrderslChangc Order No.2.xis PAGE 2 OF 2 CHANGE ORDER NO.: Three(3) DATE: 29-Sep-21 CONTRACT DATE: 19-Apr-21 ENGINEER'S PROJECT NO.: 2020003 NAME OF PROJECT: NORTH 2OTH STREET AND MAPLE STREET IMPROVEMENTS OWNER: CITY OF VAN BUREN,ARKANSAS CONTRACTOR: GOODWIN&GOODWIN,INC. THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS: The following items are added to Schedule 1 of the Project. Item Quantity Unit Amount No. Description and Unit Price of Change 6. Removal and Disposal of Concrete Driveway&Sidewalk 250 SY $15.00 $3,750.00 7. Removal and Disposal of Curb&Gutter 300 LF $12.00 $3,600.00 11, Solid Sodding 400 SY $8.00 $3,200.00 17. Curb&Gutter(Type"A") 300 EA $24.00 $7,200.00 20, Concrete Driveway(5"Thickness) 100 SY $60.00 $6,000.00 22. Concrete Sidewalk(4"Thickness) 300 SY $50.00 $15,000.00 23. Handicap Ramps 1 EA $900.00 $900.00 24. 12"RCP Class III 22 LF $40.00 $880.00 30. Concrete Inlet&Junction Boxes 1.5 CY $1,200.00 $1,800.00 31. Frame and Cover(Drainage) 1 EA $400.00 $400.00 48* Removal and Disposal of Concrete Retaining Wails 290 LF $100.00 $29,000.00 49* Unclassified Excavation 600 CY $20.00 $12,000.00 50* Select Material 50 CY $35.00 $1,750.00 51* Large Gravity Block Retaining Wall 1400 VSF $65.00 $91,000.00 52` Handrail-Galvanized Steel 320 LF $100.00 $32,000.00 53* Remove and Relocate Water Meter 4 EA $800.00 $3,200.00 54* Remove and Replace Sanitary Sewer Service 2 EA $800.00 $1,600.00 ADD $213,280.00 TOTAL CHANGE ORDER NO.3 ADD JUSTIFICATION: This Change Order No.3 is warranted to compensate the Contractor for additional scope requested by the City. The additional scope includes removal and disposal of the existing concrete retaining wall and sidewalk and replacement with new concrete sidewalk and large gravity block retaining wall at the 400 block of North 20th Street. The improvements are requested in order to provide an accessible sidwalk route.The improvements are shown in Exhibits A and B. This Change Order is also warranted to compensate the Contractor for the changes to the drainage system at the northeast corner of the intersection of North 20th Street and Alma Boulevard. The changes are necessary to create positive drainage In the intersection. A horizontal shift of the proposed grated inlet was necessary to connect incoming existing drainage pipes.This required the rim elevation of the grated inlet to rise thus reducing its ability to drain the corner of the intersection. The proposed solution is to install a new drop inlet near the radii return on Alma Boulevard as shown in Exhibit C. *An asterisk denoted by the change order unit item identifies that the proposed unit price was provided by the Contractor during the construction phase of the Project. 20200031ConslructiontChange OrderslChange Order No.3.xls PAGE 1 OF 2 CHANGE ORDER NO.: Three(3) DATE: 29-Sep-21 CHANGE TO CONTRACT PRICE: CONTRACT DATE: 19-Apr-21 ORIGINAL CONTRACT PRICE $1,092,427.50 CURRENT CONTRACT PRICE ADJUSTED BY PREVIOUS CHANGE ORDERS $1,143,592.50 THE CONTRACT PRICE DUE TO THIS CHANGE ORDER WILL BE(INCREASED)(DC-ORE-ASED)BY $213,280.00 THE NEW CONTRACT PRICE INCLUDING THIS CHANGE ORDER WILL BE $1,356,872.50 CHANGE TO CONTRACT TIME: THE CONTRACT TIME WILL BE(INCREASED (BEORE.ASED)BY 120 CALENDAR DAYS THE CONTRACT PERIOD INCLUDING THIS CHANGE ORDER SHALL BE 360 CALENDAR DAYS APPROVALS: ENGINEER: HA(, S-WEIR E GINEERS,INC. By �` Date 10/20/2021 CONTRACTOR: GOO VIN GOODWIN,INC. By Date 10/20/2021 OWNER: CITY OF VAN BUREN,ARKANSAS By Date i I t 20200031ConstructlonIChange Orders\Change Order No.3.xis PAGE 2 OF 2