Loading...
CERTIFICATIONSDRAINAGE INSPECTION REPORT AND CERTIFICATION LEGACY PLACE PHASE 2 FORT SMITH, ARKANSAS LOCATION: LEGACY PLACE PHASE 2 VAN BUREN, CRAWFORD COUNTY, ARKANSAS DEVELOPER: GAITHER MANAGEMENT TRUST DATE OF INSPECTION: MAY 24, 2021 IDENTIFICATION: ALL DRAINAGE STRUCTURES I HEREBY CERTIFY THAT THE CONSTRUCTION OF DRAINAGE STRUCTURES FOR LEGACY PLACE PHASE 2 WAS INSPECTED BY ME PERSONALLY OR BY SOMEONE UNDER MY DIRECT SUPERVISION. THE CONSTRUCTION COMPLIES WITH CITY OF VAN BUREN STANDARDS, AND THE APPROVED PLANS AND SPECIFICATIONS. ALL LOTS HAVE BEEN PROVIDED WITH ADEQUATE DRAINAGE. NO LOTS OF THE SUBDIVISION ARE WITHIN A 100 YEAR FLOOD ZONE AS DEFINED BY F.E.M.A. BRIXEY ENGINEERING & LAND SURVEYING, INC. Cie../ Anen," S-zs-Z� CHAD BRIXEY, Pf. DATE ARK. REG. P.E. NO. 11490 STREET INSPECTION REPORT AND CERTIFICATION LEGACY PLACE PHASE 2 VAN BUREN, ARKANSAS LOCATION: LEGACY PLACE PHASE 2 VAN BUREN, CRAWFORD COUNTY, ARKANSAS DEVELOPER: GAITHER MANAGEMENT TRUST DATE OF INSPECTION: MAY 24, 2021 IDENTIFICATION: ALL STREETS IN LEGACY PLACE PHASE 2 I HEREBY CERTIFY THAT THE STREET CONSTRUCTION FOR LEGACY PLACE PHASE 2 WAS INSPECTED BY ME PERSONALLY OR BY SOMEONE UNDER MY DIRECT SUPERVISION. THE CONSTRUCTION COMPLIES WITH CITY OF VAN BUREN STANDARDS. ALL LOTS HAVE BEEN PROVIDED WITH ACCESS TO THE STREETS AND WITH ADEQUATE DRAINAGE. BRIXEY ENGINEERING & LAND SURVEYING, INC. SIGNED: DATE: CHAD BRIXEY, .E. ARK. REG. P.E. NO. 11490 WATER LINE INSPECTION REPORT AND CERTIFICATION LEGACY PLACE PHASE 2 VAN BUREN, ARKANSAS LOCATION: LEGACY PLACE PHASE 2 VAN BUREN, CRAWFORD COUNTY, ARKANSAS DEVELOPER: GAITHER MANAGEMENT TRUST DATES OF INSPECTION: MARCH 30, 2021 MAY 13, 2021 WATER LINE TESTED: ALL LINES WERE TESTED ON MARCH 30, 2021. ALL LINES PASSED THE LEAKAGE TEST. INSPECTION REPORT: ALL WATER LINES HAVE BEEN CONSTRUCTED ACCORDING TO THE APPROVED PLANS AND SPECIFICATIONS. HYDROSTATIC AND LEAKAGE TESTS WERE PERFORMED ON ALL LINES. THE TESTS WERE CONDUCTED ACCORDING TO THE APPROVED SPECIFICATIONS. A FINAL INSPECTION WAS PERFORMED ON MAY 13, 2021 COMMENTS: ALL TESTING WAS PERFORMED BY FRANKLIN CONSTRUCTION AND OBSERVED BY TREY SMITHER. ALL LOTS HAVE BEEN PROVIDED WITH WATER SERVICE LINES AND METER BOXES. BRIXEY ENGINEERING & LAND SURVEYING, INC. SIGNED: DATE:,�5'Z 1_ - CHAD BRIXEY P.E. ARK. REG. P.E. NO. 11490 SANITARY SEWER LINE INSPECTION REPORT AND CERTIFICATION LEGACY PLACE PHASE 2 VAN BUREN, ARKANSAS LOCATION: LEGACY PLACE PHASE 2 VAN BUREN, CRAWFORD COUNTY, ARKANSAS DEVELOPER: GAITHER MANAGEMENT TRUST DATES OF INSPECTION: MARCH 30, 2021 MAY 13, 2021 SEWER TESTED: ALL LINES AND ALL MANHOLES WERE TESTED ON MARCH 30, 2021.. INSPECTION REPORT: THE SEWER LINE AND MANHOLES WERE CONSTRUCTED IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. BOTH LEAKAGE AND DEFLECTION TESTS WERE PERFORMED ON EACH SECTION ( MANHOLE TO MANHOLE) OF THE SEWER LINE. VACUUM TESTS WERE PERFORMED ON EACH MANHOLE TO DETERMINE LEAKAGE. A FINAL INSPECTION WAS PERFORMED ON MAY 13, 2021. TEST RESULTS: ALL GRAVITY FLOW LINES PASSED BOTH THE PRESSURE TEST AND THE MANDREL TEST. ALL MANHOLES PASSED THE VACUUM TEST. COMMENTS: THE TESTS WERE PERFORMED BY FRANKLIN CONSTRUCTION AND OBSERVED BY TREY SMITHER. ALL LOTS HAVE BEEN PROVIDED WITH SERVICE LINES TO THE SEWER MAIN. BRIXEY ENGINEERING & LAND SURVEYING, INC. SIGNED: DATE: CHAD BRIXEY, Y.E. ARK. REG. P.E. NO. 11490