Loading...
RES NO 09-03-2020 CITY OF VAN BUREN,ARKANSAS RESOLUTION NO.?-3-2020 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS,A RESOLUTION TO BE ENTITLED: A RESOLUTION AUTHORIZING THE MAYOR TO ENTER INTO A CONTRACT FOR ENGINEERING SERVICES FOR THE CITY OF VAN BUREN,ARKANSAS,AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren, Arkansas has received Federal-aid Transportation Alternatives Program grant funds for a Downtown Streetscape Project; and WHEREAS, the Downtown Streetscape and Drainage Improvements project requires a drainage evaluation and report to address necessary storm water drainage improvements affecting the downtown; and WHEREAS, storm drainage lines in the system need to be cleaned and inspected to complete the evaluation of the downtown storm drainage system. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN,ARKANSAS,THAT: SECTION 1: The Mayor is authorized to enter into a contract(Exhibit"A")with Hawkins-Weir Engineers, Inc.to provide engineering services for the development of plans and specifications for the Downtown Drainage Cleaning and CCTV Inspection Project. Payment shall not exceed $27,000.00 plus any applicable reimbursable expenses. IN WITNESS WHEREOF,the City of Van Buren,Arkansas, by its City Council,did pass, approve, and adopt, by a vote of 4-1 for and L)against,the foregoing Resolution at its regular meeting held on the 28th day of September 2020. r�1 4sF Joseph P. Hurst Mayor ATTESTED: :l 1 PR t ED • TO F I RM: �Q 4 il �7-Kj ad)a4 J •�'� Ph is Thomas Candice A. Settle City Clerk/Treasurer City Attorney HAWKINS/411/ ENGINEERS, N C . Engineering Client Success September 8, 2020 Honorable Joseph Hurst, Mayor City of Van Buren, Arkansas 1003 Broadway Van Buren, Arkansas 72956 Re: Agreement for Professional Services Downtown Drainage Cleaning and CCTV Inspection Project Van Buren,Arkansas HWEI Project No.2020092 Dear Mayor Hurst: We appreciate the opportunity to submit this proposal for engineering services associated with the Downtown Drainage Cleaning and Closed-Circuit Television (CCTV) Inspection Project along North and South 2nd Street for the City of Van Buren, Arkansas. Enclosed, please find a Scope of Services task list detailing the Basic Services proposed for this project. The project will include the development of a bid package to clean and inspect the storm drain line along North and South 2nd Street from Washington Street to Sycamore Street. The scope of service includes a project limits exhibit map that further illustrates the location of the improvements. In summary, our services will consist of the following phases Field Survey, Final Design, Advertisement & Bidding, and Construction Management. Our deliverables will include specifications and detailed plans for the cleaning and inspection project. The Scope of Services task list for this project also identifies several exclusions or items not included in our proposal or items to be provided by others. Our fee for Basic Services will be invoiced based on our Standard Hourly Billing Rates as compensation for services and expenses of principals and employees of Hawkins-Weir Engineers, Inc. The not to exceed fee for these services is $27,000.00 plus Subconsultant Fees and Reimbursable Expenses. Additional services will be provided only upon receipt of written authorization, and these additional services will be invoiced at our standard hourly rates. A copy of our Standard Hourly Billing Rate Structure is enclosed. 110 So. 7th Street • P.O. Box 648 • Van Buren, AR 72957 • Ph: (479)474-1227 • Fax:(479)474-8531 2 11 Natural Resources Drive • Little Rock, AR 72205 • Ph: (501)374-4846 438 East Millsap Road • Suite 200 • Fayetteville, AR 72703 • Ph:(479)455-2206 403 Garrison Avenue • Suite 1(11 • Fort Smith, AR 72901 • Ph: (479)242-4685 2020092\JHO90820K5.docx — Honorable Joseph Hurst, Mayor Page 2 September 8, 2020 Reimbursable Expenses, including subconsultant fees, incurred in connection with all Basic and Additional Services will be charged based on their actual cost. We recommend that you budget an additional$500.00 for the following reimbursable expenses:ARKUPS utility locate fees and reproduction costs. We do not anticipate any other subconsultants on the project at this time. We will invoice you monthly for Basic Services and Reimbursable Expenses. We will commence this work immediately upon your authorization to proceed, and complete the work within 30 days. If there are changes in scope or protracted delays for reasons beyond our control, we would expect to negotiate with you an equitable adjustment of our compensation taking into consideration the impact of such changes and delays. This proposal letter together with the enclosed Agreement for Professional Services represents the entire agreement with Hawkins-Weir Engineers, Inc. If this proposal is acceptable, please sign and date both copies of the enclosed Agreement and return one (1) copy to us. The remaining copy is for your records. Should you have any questions, comments, or require additional information, please do not hesitate to call. Sincerely yours, HAWKINS-WEIR ENGINEERS, INC. J. Kyle Salyer, P.E., P.S. J KS/mcw Enclosures: Scope of Services (3 pages) Agreement for Professional Services—Two (2) copies cc: Mr. Wally Bailey, City of Van Buren Ms. Becky Home, Hawkins-Weir Engineers, Inc. 2020092\JHO90820KS.docx wwm hawkirrs-weir.corn Scope of Services Cleaning and CCTV Evaluation Downtown Streetscape and Drainage Improvements Project HWEI Project No. 2020092 September 8, 2020 Hawkins-Weir Engineers, Inc. (HW)proposes to provide the following engineering design services for the referenced Downtown Streetscape and Drainage Improvements project in the City of Van Buren. Unless otherwise noted the limits of the project are limited to the storm drain line depicted on the attached Exhibit. A. Field Survey Phase 1. Research available record drawings of existing storm drain system 2. Perform a field and utility location survey of the existing drainage structures along the storm drain line identified by the City of Van Buren 3. Perform a topographic survey of the site, including critical spot elevations on existing improvements such as drainage pipe flow lines, curbs, pavement, and drainage structure improvements 4. Coordinate with Arkansas One-Call for the marking of existing utilities and tie them down as part of the survey work based on the locations marked in the field by the utility owner 5. Prepare a scaled drawing in AutoCAD format d B. Final Design Phase 1. Prepare final plans of the storm drain line to be cleaned and inspected 2. Prepare final contract documents and specifications for performance-based storm drain line cleaning and closed-circuit television (CCTV) inspection or incorporate specification notes into the plan sheets 3. Perform internal Quality Assurance/Quality Control review C. Advertisement and Bidding 1. Prepare the project advertisement for the Owner's use 2. Address questions and comments from perspective bidders and prepare any necessary addendums to the Bidding Documents 3. Attend and conduct the bid opening including the preparation of a certified tabulation of bids and recommendation to the Owner 4. Assist the Owner with the assembly and execution of contract documents D. Construction Management Services 1. Participate in a prework conference for the cleaning and CCTV inspection activities 2. Assist in the review of change orders during cleaning and CCTV inspection of the existing storm drain system 2020092 Scope of Services 090820 Page 1 of 3 Scope of Services Cleaning and CCTV Evaluation Downtown Streetscape and Drainage Improvements Project HWEI Project No. 2020092 September 8, 2020 3. Provide Periodic Observation of the cleaning and CCTV activities 4. Prepare a report summarizing observations from the closed-circuit television data and Pipeline Condition Assessment reports to be provided by the Contractor 5. Prepare Record Drawings for the storm drainage system E. Exclusions to the Scope of Services The design services provided by Hawkins-Weir do not cover the preparation of the following: 1. Boundary Surveys 2. Abstract, deed or easement research 3. Preparation of deed or easement descriptions 4. Coordination with Union Pacific Railroad or solicitation of UP construction permitting 5. Evaluation of storm drain material or structural conditions, flow capacity, or remaining useful life 6. Environmental assessment or evaluation of the site 7. Design of storm drainage improvements or utility relocation plans 8. Architectural, electrical, mechanical, or structural design of buildings, canopies, retaining walls, delivery docks, etc. 9. As-Built survey of the final improvements 10. Project advertisement fees 11. Structural design Attachment: Exhibit 1 — Project Limits 2020092 Scope of Services 090820 Page 2 of 3 . . a:-- ,...„, war En i • y, ..1 1 ga 111 a ill DO 0 i II .... cicojclisr3 lifzrzwa-411C:2111s6.sot.hft3hsTrd:T6. r. iill _. gill Ill' 0 P . oc3 Ell III, -01111- , is i , p I i 11. . C=301 Illi 5<jtCSICaTlit. 'I 0 MAP p MI I am z C31 ill si I C3.111 il . ami --..... 0 i Cill r :1,.____9" linli :21 -"EMENINiss 1-'••••••r- A —111 Fr Li cm ...ill •Ar MN / a i 1 .1 I I: ________ r ---c.:11411466101 oft, CD li - ---\:i El 1 0 1:! / C3 it 4 oic::::, V 0 0 ouji 1.5 ,71110 04.) 4, / ,.... z g trj° 0 _,.° s fa ..... ,,,,.. III nr,i -1=Z-r=] 0 i I Mr Lip i li f S. Srd -II . 11 --u\I /— ‘.............- 8 .111111." _ I 111 ,-.11K1 r.... ..TIN .. .PROJECT MN a a --tral 111 E airli-11-1-11 I Limns"la 111 toff,a _ 414‘..imitiNir ........,_ mi j 1 IIII Iiri2INiwiDST ..'."'."..1111111111111a- -."------":111.'""iii:......11&:13Eilli.."-----."'-----.111 lir.L:?IIIIII1= I 'N....., ..___,. i 11111------■ ----____r.-4" 111 in -- --- .; 4 MEP aft......„ .......11 3 s. istaist . EXHIBIT 1 4405L 0% PROJECT LIMITS D CLEANING AND CCTV INSPECTION 0 0 FOR: CITY OF VAN BURBUR (,E ARKANSAS 11 MI ---*/* DATE: SEPT. 2020 SCALE: 1=200' JOB NO.2020092 - MENGINEESR68, 1IC. 121 11.4 /11, IIIM r-A111 ..- M85)474-1227 I(485)2:24185 I AT455-2206 I(501)37=46 .S. www.hawkIns-welr.corn r4 I HAWKINS-WEIR ENGINEERS.INC. AGREEMENT FOR PROFESSIONAL SERVICES CITY OF VAN BUREN,ARKANSAS HWEI Project Number: 2020092 1003 BROADWAY Authorized by:JOE HURST,MAYOR VAN BUREN,ARKANSAS 72956 Project Manager: J.KYLE SALYER,P.E.,P.S. PHONE: (479)474-1541 Date: SEPTEMBER 8,2020 Description of Work: DOWNTOWN DRAINAGE CLEANING AND INSPECTION ALONG 2ND STREET IN VAN BUREN,ARKANSAS ENERAL:HAWKINS-WEIR ENGINEERS,INC.(HWEI)shall perform the professional services indicated on this Agreement. These services shall include serving as the Client's professional engineering and/or surveying representative providing consultation and advice as requested by this Agreement. COPE OF SERVICES:Services to be provided by HWEI shall be as described on this Agreement and noted attachments and other services shall not be implied unless so stipulated by a written agreement acknowledged by client and HWEI. !ACCESS: The Client shall provide to Engineer legal access to all properties,public and private,required to perform the services requested. INFORMATION PROVIDED BY CLIENT:The Client shall provide all criteria and full information such as surveys,legal descriptions,subsurface explorations,hydrographic surveys, laboratory tests,flood plain data,environmental assessments,environmental impact statements,utility or other easements, zoning and deed restrictions as may be available to the Client which pertain to the work to be performed. HWEI may rely on such ilnformation supplied by the Client in performing services hereunder. ERMITS: Client shall furnish all approvals and permits for all governmental authorities or other entities having jurisdiction. A EUSE OF DOCUMENTS: All documents including drawings,specifications and reports prepared by or furnished by HWEI pursuant to this greement are instruments of service with regard to the work being performed and HWEI shall retain an ownership and property interest therein.Client ay make and retain copies for information and reference in connection with the use and occupancy of the project by client and others,however,such documents are not intended or represented to be reused by Client or others on extensions of the project or any other project. Any reuse of documents 'ithout written authorization by HWEI shall be at Client's sole risk and Client shall hold HWEI harmless and without liability. OOMPENSATION FOR SERVICES:HWEI shall be compensated for services rendered under this Agreement as follows: ii HOURLY,NOT TO EXCEED S27,000.00,PLUS SUBCONSULTANT FEES AND REIMBURSABLE EXPENSES OTHER CONDITIONS: • All fees and expenses paid by HWEI on behalf of the Client shall be reimbursed by the Client to HWEI based on actual cost,(i.e.,filing fees, advertisement costs,testing fees,review fees,express mail or courier,professional services by others). • HWEI shall be reimbursed by the client for all travel expenses including meals and lodging at actual cost for travel from the HWEI office. HWEI shall be reimbursed for all travel expenses including mileage computed at the current IRS standard mileage rates to and from HWEI offices, vehicle rental fees,and coach rate common carrier fares,plus all parking and toll fees expended on travel on the behalf of the Client. • Client may terminate the services of HWEI at any time upon written notification to HWEI. HWEI shall be paid for all services rendered to the time of termination. • Unless otherwise agreed upon by HWEI and Client,if Client fails to make full payment due HWEI for services and expenses within 30 days after receipt of HWEI's Invoice of Services,the amounts due HWEI may be increased at the rate of 0.5%per month or the maximum rate of interest allowed by law at the time this Agreement is entered into,whichever rate is less,from said 30th day. In addition,HWEI may,after giving 7 days written notice to Client,suspend services under this Agreement and may proceed with formal collection procedures. Client shall pay the cost of collection procedures. Should litigation be necessary,Arkansas will be the state of litigation and Arkansas law shall govern. • Client understands and acknowledges that HWEI shall have a lien upon the land,building,erection,or improvement upon said land for services rendered to client as provided in Arkansas Code Annotated 18-44-105. • To the maximum extent permitted by law,the Client agrees to limit HWEI's liability for the Client's damages to a maximum of the net compensation received by HWEI,not including reimbursable expenses and subconsultant fees,for all services rendered on the project. This limitation shall apply regardless of the cause of action or legal theory pled or asserted. GHTS:Nothing in this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than Client and HWEI,and ties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Client and HWEI and not for the benefit any other party. ATTACHMENTS:LETTER PROPOSAL:CURRENT HWEI STANDARD BILLING RATE SCHEDULE ACCEPTED THIS DAY OF ,2020 OR Ti Verbal Authorization Received to Proceed with services - CITY OF VAN BUREN,ARKANSAS SEPTEMBER 8,2020 ORGANIZATION,COMPANY,OR INDIVIDUAL ACCEPTING DATE RESPONSIBILITY FOR PAYMENT FOR SERVICES RENDERED V /y4 /5e-15.04 BY KO Hawkins-Weir Engineers,Inc. • PO BOX 648 • VAN BUREN,ARKANSAS 72957 • PHONE(479)474-1227 • FAX(479)474-8531 • • 211 NATURAL RESOURCES DRIVE • LITTLE ROCK,ARKANSAS 72205 • PHONE(501)374-4846 • • 438 EAST MILLSAP ROAD,SUITE 107 • FAYETTEVILLE,ARKANSAS 72703 • PHONE(479)455-2206 • • 403 GARRISON AVENUE,SUITE 101 • FORT SMITH,ARKANSAS 72901 • PHONE(479)242-4685 • Standard Billing Rate Structure For Hourly Fee Based Contracts Hawkins-Weir Engineers,Inc. Effective August 16,2020 through August 14,2021(') Engineer Engineer VII $ 190 Per Hour Engineer VI $ 175 Per Hour Engineer V $ 160 Per Hour Engineer IV $ 145 Per Hour Engineer III $ 125 Per Hour Engineer II $ 100 Per Hour Engineer I $ 85 Per Hour Engineering Technician Designer II $ 100 Per Hour Designer I $ 75 Per Hour Technician N $ 85 Per Hour Technician III $ 75 Per Hour Technician II $ 65 Per Hour Technician I $ 55 Per Hour Field Technician-Field Inspector Resident Project Representative(RPR) $ 120 Per Hour Inspector II $ 75 Per Hour Inspector I $ 65 Per Hour Field Surveying GPS Survey $ 175 Per Hour GPS Mapping Survey $ 95 Per Hour Surveyor $ 85 Per Hour Administrative Business Manager $ 85 Per Hour Expert Witness Preparation At Engineer's Hourly Rate Testimony,less than 1/2 day $1,000 Testimony,per Day $2,000 Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract Subconsultants/Outside Services Express Delivery,Field Supplies,Testing,Review/Filing Fees and Advertising Travel: Hotel and meals Actual Cost Vehicle) $0.575 per mile effective 1/1/20 Reproduction: Outside printing service Actual Cost In-house printing Letter Copy-B&W $ 0.10 Per Copy Letter Copy-Color $ 0.75 Per Copy 22 x 34 Size Copy-B&W $ 3.00 Per Copy 22 x 34 Size Copy-Color $10.00 Per Copy 11 x 17 Size Copy-B&W $ 1.50 Per Copy 11 x 17 Size Copy-Color $ 5.00 Per Copy CD Copy $ 5.00 Per Copy Binding $ 1.00 Each (D Billing Rates are reviewed and adjusted annually in August. Regardless,any adjustment in Billing Rates will not impact previously negotiated Not To Exceed(NTE)fee amounts without a formal Contract Amendment. (2)To be adjusted periodically to current IRS mileage rate. All Billings are due upon receipt unless prior arrangements for payment have been made. I