Loading...
RES NO 03-04-2019 CITY OF VAN BUREN, ARKANSAS RESOLUTION NO.103-04-2019 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS, A RESOLUTION TO BE ENTITLED: A RESOLUTION ACCEPTING THE BID OF HARRIS UNITED, LLC FOR THE POINTER TRAIL SIDEWALK IMPROVEMENT PROJECT, AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren has advertised for bids for the Pointer Trail Sidewalk Improvement Project; and WHEREAS, bids have been received and opened in accordance with Arkansas law and Harris United, LLC was the lowest bidder meeting the bid specifications; and WHEREAS, the City of Van Buren has determined that the bid of Harris United, LLC is the best bid. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN,ARKANSAS, THAT: SECTION 1: The City of Van Buren, Arkansas accepts the bid of$286,694.00 as submitted by Harris United, LLC as set forth in "Exhibit A" attached hereto, contingent on receiving concurrence from Arkansas Department of Transportation. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to pay all expenses relating to the Pointer Trail Sidewalk Improvement Project and to execute all documents necessary to effectuate the agreement. IN WITNESS WHEREOF, the City of Van Buren, Arkansas, by its City Council, did pass, approve, and adopt, by a vote of Co for and 0 against,the foregoing Resolution at its regular meeting held on the 25th day of March 2019. . CC44:ri— Jos . Mayor ATTESTED: APP ' i ' . ' AS TO FORM: 41011 d-/-6,4/07))04. Ph 1 Thomas . •• - le City Clerk/Treasurer City Attorney 7 City of Van Buren jf Pointer Trail Sidewalk Improvements Tabulation of Bids Received on January 29,2019,10:00 a.m. HWEI Project No.2016096 Engineer's Estimate Curb Time Solutions,LLC Goodwin&Goodwin,inc. Harris United Crawford Construction Sze Nonreponsive Nonresponsive Company i ItemB Description Quantity Unit Bid Unit Cost Bid Unit Cost Bid Unit Cost Bid Corrected Bd Unit Cost Bid 1. Traffic Control 1 LS $20,000.00 $20,000.00 $21,550.00 $21,550.00 $27,500.00 $27,500.00 2. Temporary Erosion and Sediment Control 1 LS $13,000.00 $13,000.00 $27,250.00 $27,250.00 $16,000.00 $16,000.00 3. Site Preparation 1 LS $16,000.00 $16,000.00 $60,000.00 $60,000.00 $38,500.00 $38,500.00 4. Removal and Disposal of Concrete Sidewalk 10 SY $15.00 $150.00 $10.00 $100.00 $10.00 $100.00 5. Removal and Disposal of Concrete Driveway 452 5Y $15.00 $6,780.00 $10.00 $4,520.00 $10.00 $4,520.00 • 6. Removal and Disposal of Curb and Gutter 311 LF $10.00 $3,110.00 $10.00 $3,110.00 $10.00 $3,110.00 7. Clearing and Grubbing 1 LS $1,000.00 $1,000.00 $2,500.00 $2,500.00 $1,000.00 $1,000.00 8. Seeding,Fertilizing,and Mulching 1 AC $1,000.00 $1,000.00 $3,000.00 $3,000.00 $2,800.00 $2,800.00 9. Aggregate Base Course 422 TN $45.00 $18,990.00 $30.00 $12,660.00 $70.00 $29,540.00 V. 10. Concrete Driveway(6"Thickness) 452 SY $65.00 $29,380.00 $40.00 $18,080.00 $60.00 $27,120.00 • 11. Concrete Sidewalk(4"Thickness) 1,935 SY $45.00 $87,075.00 $37.00 $71,595.00 $35.20 $68,112.00 tz fVi12. Concrete Sidewalk with Turned Down Edge 128 SY $45.00 $5,760.00 $50.00 $6,400.00 $45.00 $5,760.00 t.,., 13. Concrete Sidewalk with Turned Up Edge 64 SY $45.00 $2,880.00 $46.00 $2,944.00 $50.00 $3,200.00 i14. Hand Rail 225 LF $75.00 $16,875.00 $50.00 $11,250.00 $70.00 $15,750.00 r 15. Curb&Gutter 103 LF $25.00 $2,575.00 $15.00 $1,545.00 $17.60 $1,812.80 q' 16. ADA Accessible Ramp Type 3 42 EA $800.00 $33,600.00 $600.00 $25,200.00 $825.00 $34,650.00 17. ADA Accessible Ramp Type 6 2 EA $800.00 $1,600.00 $1,350.00 $2,700.00 $825.00 $1,650.00 18. Traffic Paint Pavement Marking(White 24") 240 LF $5.00 $1,200.00 $7.50 $1,800.00 $10.00 $2,400.00 • 19. Remove and Relocate Sign 8 EA $200.00 $1,600.00 $200.00 $1,600.00 $200.00 $1,600.00 20. Adjust Fiber Optic Cable Vault to Grade 2 EA $1,000.00 $2,000.00 $2,500.00 $5,000.00 $250.00 $500.00 k' 21. Adjust Valve Box Riser to Grade 8 EA $120.00 $960.00 $330.00 $2,640.00 $100.00 $800.00 4' 22. Remove Natural Gas Riser 1 EA $500.00 $500.00 $250.00 $250.00 $400.00 $400.00 x. 23. Remove and Relocate Electrical Outlet 1 EA $500.00 $500.00 $1,000.00 $1,000.00 $400.00 $400.00 ' TOTAL BID $266,535.00 $288,944.00 $286,694.00 $287,224.80 t kY e. 2016096/Bidding/Bid Tabulation 012919.xls Page 1 of 2 f' J t City of Van Buren Pointer Trail Sidewalk Improvements Tabulation of Bids Received on January 29,2019,10:00 a.m. HWEI Project No.2016096 /CON,Inc. Township Mdrws,Me. Stew Mem T-N-T,Inc. v CerMMrction Dente Damdmion Opant ly Unit tact Cost lid Unit Cest lid Unit Get lid unit Coot Bid 1. TraflIc Control 11 LS $9,900.00 $9,900.00 $27,000.00 $27,000.00 $74,000.00 $74,000.00 $54,000.00 $54,000.00 2. Temporary Emden and Sediment Centred 1 LS $33,275.00 $33,275.00 $12,060.00 $12,000.00 $30,960.00 $30,960.00 $24,000.00 $24,000.00 i- 3. Ate Preparation 1 LS $1,790.00 $1,700.00 $34,915.00 $34,915.00 $23,100.00 $23,100.00 $25,000.00 $25,000.00 4. Removal and Disposal of Concrete Sidewalk 10 5Y $16.05 $160.50 $23.00 $250.00 $72.00 $720.00 $55.00 $550.00 5. Removal and Disposal of Concrete Orleewey 452 57 $23.00 $10,396.00 $25.00 $11,300.00 $35.00 $15,820.00 $25.00 $11,300.00 6. Amami and Disposal of Curb end Gutter 311 LF $4.50 $1,399.50 $15.00 $4,665.66 $19.00 $5,5!6.00 $34.00 $10,574.00 7. Clearing and Grubbing 1 LS $2,350.00 $2,350.00 $10.000.00 $10,000.90 $4,500.00 $4,500.00 $4,000.00 $4,000.00 I. 8. Seed rq,FertilkMy and MuldrkK 1 AC $10,950.00 $10,950.00 $2,760.00 $2,700.00 $2,900.00 $2,900.00 $7,000.00 $7,000.00 ':. 9. Aggregate base Course 422 TN $57.00 $24,054.00 $33.00 $14,770.00 $90.00 $37,960.00 $54.00 $22,799.00 10. Concrete Driveway(i"Thickness) 452 SY $72.00 $32,544.00 $70.00 $31,640.00 $60.00 $27,120.00 $90.00 $36,160.00 11. Concrete Sidewalk(4'Thickness) 1,935 SY $54.00 $104,490.00 $60.00 $116,100.00 $74.70 $144,544.50 $76.00 $147,060.00 12. Concrete Sidewalk with Turned Down Edge 126 Sy $91.00 $10,363.00 $115.00 $14,720.00 $65.00 $10,990.00 $140.00 $17,920.00 *. 13. Concrete Sidewalk with Turned Up Edge 64 SY $60.00 $5,120.00 $230.00 $14,720.00 $94.00 $6,016.00 $120.00 $7,680.00 14. Nand Ral 225 LF $115.00 $25,175.00 $73.00 $16,975.00 $62.00 $13.950.00 549.00 $10,900.00 15. Curb&Gutter 103 LF $16.00 $1,641.00 $40.00 $4,120.00 $33.00 $3,914.00 $36.00 $3,708.00 16. ADA Accessible Rung Type 3 42 EA $1,390.00 $57,960.00 $700.00 $29,400.00 $360.00 $15,120.00 $765.00 $32,130.00 17. ADA Accessible Ramp Type 6 2 EA $1,650.00 $3,300.00 $1,350.00 $2,700.60 $460.00 $960.00 $1,000.00 $2,000.00 18. Traffic Paint Pavement Marking(White 24") 240 LF $9.75 $2,100.00 $10.00 $2,400.00 $690 $1,656.00 $9.00 $2,160.00 19. aernove and Relocate Sign 8 EA $115.00 $920.00 $225.00 $1,800.00 $190.00 $1,440.00 $250.00 $2,000.00 1. 20. Adjust Fiber Optic Cable Vault to Grade 2 EA $450.00 $900.00 $1,500.00 $3,000.00 $700.00 $1,400.00 $600.00 $1,200.00 21. Adjust Valva boa Riser to Grade 9 EA $300.00 $2,400.60 $250.00 $2,000.00 $113.00 $904.00 $250.00 $2,000.00 22. "Remove Natural Gas Riser 1 EA $300.00 $300.00 $700.00 $700.00 $700.00 $700.00 $1,000.00 $1,000.00 23. Remove and Relocate Electrical Outlet 1 EA $300.00 $300.80 $500.00 $500.00 $t40.0O $610.00 $2000.00 $2,000.00 TOTAL 600 $349,490.00 $358,275.00 $425,042.50 $427,030.00 4, a' I hereby certify that this tabulation Is a true and accurate representa all bids received. i.1I SI ATE p; 1i ARIFA AS ". Larry Ekis Ya ,P.E. . ,� 44 Hawkins-Weir Engineers,Inc. ; R •T ` Arkansas License No.12185 t PR• S c `� L �� c!r r i� �.�e �P O.12185 c-iii F<GIS Yp si1 i`�\j' Mise/ 2016096/MddIi utd Tabulation 012919.ak 2 Page 2 of 2