RES NO 09-05-2002 CITY OF VAN BUREN, ARKANSAS 0 RESOLUTION NO. e t 5 -2002 A RESOLUTION APPROVING AN INCREASE IN THE CONTRACT PRICE FOR THE SHERWOOD STREET PROJECT. WHEREAS, The Mayor has advertised for bids for the Sherwood Street Project; and WHEREAS, The bid of Harris Company in the amount of $113,977.14 was accepted by the Council; and WHEREAS, Due to unforeseen circumstances, the amount to complete the street improvements has increased; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS: SECTION 1: That the increase of $4,005.96 to the Contract with Harris Company for street improvements is hereby accepted. SECTION 2: That the Mayor is authorized and directed to pay for same out of the Street Fund. PASSED AND APPROVED THIS 16-4 DAY OF SEPTEMBER, 2002. 1 MAYO J O IN RIC ATTESTED: Ce*A -AX 4 CITY CLERKITRE' 0 Project: 2002 Street Improvements /Sherwood Street 0 Contractor: Harris Company of Fort Smith, Inc. Change Order No. 1 Date: 9/9/02 Project Contract Item No. Quantity Unit Description Unit Cost Amount 1 1 LS Site Preparation $32,875.00 $32,875.00 2 103 SY Remove Replace 6" Concrete Driveway $35.00 $3,605.00 3 263 SY Concrete Sidewalk (5' wide) $12.90 $3,392.70 4 840 LF Concrete Curb Gutter $10.00 $8,400.00 5 6 EA Furnish Install 5'x5' Side Inlet $1,700.00 $10,200.00 6 1 EA Furnish Install 5'x7' Side Inlet $2,000.00 $2,000.00 7 386 LF 14 "x22" RCPA $34.00 $13,124.00 8 85 LF 11 "x18" RCPA $30.84 $2,621.40 9 1 EA 115(18" RC Flared -end Section $500.00 $500.00 10 0 SY Grade Compact Subgrade $5.98 $0.00 11 795 TONS Furnish Install Class 7 Crushed Stone Base $13.50 $10,732.50 12 200 TONS Furnish Install Class 2 Asphalt Concrete Pavement $60.00 $12,000.00 13 0 LF Furnish Install 4" Underdrain $9.00 $0.00 14 300 SY Furnish Install Bermuda Sod $2.00 $600.00 15 0 EA Remove Relocate Fire Hydrant $1,000.00 $0.00 16 715 TONS Undercut Replace w/ "B" Stone $15.50 $11,082.50 17 120 SY Cold Mill Asphalt $16.00 $1,920.00 18 10 SY PC Base $20.00 $200.00 19 1440 SY Remove Dispose Asphalt Paving $2.00 $2,880.00 20 125 CY Unclassified Excavation $10.00 $1,250.00 21 1 LS Seed Mulch Disturbed Area $600.00 $600.00 Totals $117,983.10 Current Contract Amount $113,977.14 Change Order No. 1 Amount $4,005.96