Loading...
RES NO 10-09-2018 CITY OF VAN BUREN,ARKANSAS RESOLUTION NO. U) - 9 -2018 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN ARKANSAS,A RESOLUTION TO BE ENTITLED: A RESOLUTION TO AMEND RESOLUTION 03-04-2018 TO AUTHORIZE THE MAYOR TO EXECUTE AN ADDENDUM TO THE ENGINEERING CONTRACT FOR THE VALLEY FORGE DRAINAGE IMPROVEMENT PROJECT; APPROPRIATING ADDITIONAL FUNDS; AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren,Arkansas pursuant to Resolution No.03-04-2018 entered into a contract dated February 16, 2018, with Hawkins-Weir Engineers, Inc., to perform certain engineering services relative to the Valley Forge Drainage Improvement Project; and WHEREAS, additional engineering services were necessary to facilitate the design of the project that necessitates increasing the engineering fees by$38,830.00. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN,ARKANSAS,THAT: SECTION 1: The Mayor is authorized by the City Council for the City of Van Buren to execute a contract amendment Hawkins-Weir Engineers, Inc. to modify the original February 16, 2018 engineering contract. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to expend up to $38,830.00 in additional engineering fees and expenses for the Valley Forge Drainage Improvement Project. SECTION 3: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to execute all documents necessary to effectuate this Resolution. IN WITNESS WHEREOF,the City of Van Buren,Arkansas, by its City Council, did pass, approve, and adopt,by a vote of if for and 0 against,the foregoing Resolution at its regular meeting held on the 29th day of October 2018. Robert D. Freeman Mayor ATTESTED: APP' : •`; TO FORM: 1•41 Thomas \ Ca A.' ettle City Clerk/Treasurer City Attorney CITY OF VAN BUREN,ARKANSAS AMENDMENT NUMBER 1 For PROFESSIONAL ENGINEERING SERVICES With HAWKINS-WEIR ENGINEERS,INC. VAN BUREN,ARKANSAS In accordance with the AGREEMENT for PROFESSIONAL SERVICES for the Valley Forge Drainage Improvements, Project No. 2018018,dated February 16, 2018, between the City of Van Buren, Arkansas (hereinafter called Owner)and Hawkins-Weir Engineers, Inc. (hereinafter called Engineer),Owner hereby authorizes Engineer to proceed with the following services: SECTION 1 —SCOPE OF SERVICES 1.1 Amendment No. 1 defines additional engineering services under the agreement associated with the Owner's project, Valley Forge Drainage Improvements. Additional Services include the following items: 1. Prepare Water and Sewer Relocations Plans 2. Assemble Contract Documents 3. Conduct Pre-Construction Conference 4. Submittal Review 5. Periodic Construction Observation 6. Prepare Monthly Payment Requests 7. Conduct Final Inspection 8. Prepare Contract Closeout Documents 9. Prepare Record Drawings SECTION 2—TIME OF SERVICE 2.1 The scope of services as defined above is based on a contract construction period of 120 calendar days for the Owner's project,Valley Forge Drainage Improvements,generally to include periodic inspection based on an estimated 24-hours of Inspector II time per week over the contract construction period. Construction observation services under this contract are based on construction work being continuous throughout the Page 1 of 2 construction period. Engineer will proceed with providing the services set forth herein immediately upon execution of this Amendment No. 1 by all parties. SECTION 3—COMPENSATION 3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the terms of the Agreement. Total payment for the Scope of Services described herein shall not exceed Thirty Eight Thousand Eight Hundred Thirty and 00/100 Dollars($38,830.00)without written approval of Owner. These additional services adjust the Agreement's not to exceed fee to$57,630.00. AUTHORIZATION BY: CITY OF VAN BUREN,ARKANSAS By: Bob Freeman Mayor Date: ACCEPTED BY: HAWKINS-WEIR ENGINEERS, INC. By: Larry E. Yan , P.E. Principal, Vice President Date: /0/g//g// g Page 2 of 2 Standard Billing Rate Structure For Hourly Fee Based Contracts Hawkins-Weir Engineers,Inc. Effective August 19,2018 through August 17,2019 Engineer Engineer VII $ 185 Per Hour Engineer VI $ 165 Per Hour Engineer V $ 155 Per Hour Engineer IV $ 135 Per Hour Engineer Ill $ 120 Per Hour Engineer II $ 105 Per Hour Engineer I $ 85 Per Hour Engineering Technician Designer I1 $ 100 Per Hour Designer I $ 75 Per Hour Technician IV $ 85 Per Hour Technician III $ 75 Per Hour Technician II $ 65 Per Hour Technician I $ 55 Per Hour Field Technician-Field Inspector Resident Project Representative(RPR) $ 120 Per Hour Inspector II $ 75 Per Hour Inspector I $ 65 Per Hour Field Surveying GPS Survey $ 175 Per Hour Surveyor $ 85 Per Hour Administrative Business Manager $ 85 Per Hour Expert Witness Preparation At Engineer's Hourly Rate Testimony,less than 1/2 day $1,000 Testimony,per Day $2,000 Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract Subconsultants/Outside Services Express Delivery,Field Supplies,Testing,Review/Filing Fees and Advertising Travel: Hotel and meals Actual Cost Vehicle* $0.545 per mile effective 1/1/18 Reproduction: Outside printing service Actual Cost In-house printing Letter Copy-B&W $ 0.10 Per Copy Letter Copy-Color $ 0.75 Per Copy 22 x 34 Size Copy-B&W $ 3.00 Per Copy 22 x 34 Size Copy-Color $10.00 Per Copy 11x 17 Size Copy-B&W $ 1.50 Per Copy 11 x 17 Size Copy-Color $ 5.00 Per Copy CD Copy $ 5.00 Per Copy Binding $ 1.00 Each ;:To be adjusted periodically to current IRS mileage rate All Billings are due upon receipt unless prior arrangements for payment have been made.