RES NO 10-07-2018 CITY OF VAN BUREN,ARKANSAS RESOLUTION NO. 10 - � -2018 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN ARKANSAS, A RESOLUTION TO BE ENTITLED: A RESOLUTION TO AMEND RESOLUTION 12-02-2015 TO AUTHORIZE THE MAYOR TO EXECUTE AN ADDENDUM TO THE ENGINEERING CONTRACT FOR THE DRENNEN- SCOTT HOUSE SIDEWALK IMPROVEMENT PROJECT; APPROPRIATING ADDITIONAL FUNDS; AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren,Arkansas pursuant to Resolution No.123-02-2015 entered into a contract dated December 22, 2015, with Hawkins-Weir Engineers, Inc., to perform certain engineering services relative to the Drennen-Scott House Sidewalk Improvement Project; and WHEREAS, additional engineering services were necessary to facilitate the design of the project that necessitates increasing the engineering fees by$23,460.00. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN,ARKANSAS,THAT: SECTION 1: The Mayor is authorized by the City Council for the City of Van Buren to execute a contract amendment Hawkins-Weir Engineers, Inc. to modify the original December 22, 2015 engineering contract. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to expend up to $23,460.00 in additional engineering fees and expenses for the Drennen-Scott House Sidewalk Improvement Project. SECTION 3: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to execute all documents necessary to effectuate this Resolution. IN WITNESS WHEREOF,the City of Van Buren, Arkansas, by its City Council, did pass, approve, and adopt, by a vote of 5 for and O agai . •e foregoing Resolution at its regular meeting held on the 29t1 day of October 2018. • - Robert D. Freeman M ATTESTED: , APP OVE 1 ! '• 'M: Ph lis Thomas uandice A. Settle City Clerk/Treasurer City Attorney CITY OF VAN BUREN,ARKANSAS AMENDMENT NUMBER 1 For PROFESSIONAL ENGINEERING SERVICES With HAWKINS-WEIR ENGINEERS, INC. VAN BUREN,ARKANSAS In accordance with the AGREEMENT for PROFESSIONAL SERVICES for the Drennen-Scott House Sidewalk Improvements,Project No.2015105,dated December 22,2015,between the City of Van Buren, Arkansas(hereinafter called Owner)and Hawkins-Weir Engineers,Inc.(hereinafter called Engineer),Owner hereby authorizes Engineer to proceed with the following services: SECTION 1 —SCOPE OF SERVICES 1.1 Amendment No. 1 defines additional engineering services under the agreement associated with the Owner's project, Drennen-Scott House Sidewalk Improvements. Additional Services include the following items: 1. Coordination with Arkansas& Missouri Railroad 2. Assemble Contract Documents 3. Conduct Pre-Construction Conference 4. Submittal Review 5. Periodic Construction Observation 6. Prepare Monthly Payment Requests 7. Conduct Final Inspection 8. Prepare Contract Closeout Documents 9. Prepare Record Drawings SECTION 2—TIME OF SERVICE 2.1 The scope of services as defined above is based on a contract construction period of 90 calendar days for the Owner's project, Drennen-Scott House Sidewalk Improvements, generally to include periodic inspection based on an estimated 16-hours of Inspector II time per week over the contract construction period. Page 1 of 2 Construction observation services under this contract are based on construction work being continuous throughout the construction period. Engineer will proceed with providing the services set forth herein immediately upon execution of this Amendment No. 1 by all parties. SECTION 3—COMPENSATION 3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the terms of the Agreement. Total payment for the Scope of Services described herein shall not exceed Twenty Three Four Hundred Sixty and 00/100 Dollars ($23A60.00) without written approval of Owner. These additional services adjust the Agreement's not to exceed fee to$40,060.00. AUTHORIZATION BY: CITY OF VAN BUREN, ARKANSAS By: Bob Freeman Mayor Date: ACCEPTED BY: HAWKINS-WEIR ENGINEERS, INC. By: Larry E. Yanc , P.E. Principal,Vice President Date: /o/cf// Page 2 of 2 Standard Billing Rate Structure For Hourly Fee Based Contracts Hawkins-Weir Engineers,Inc. Effective August 19,2018 through August 17,2019 Engineer Engineer VII $ 185 Per Hour Engineer VI $ 165 Per Hour Engineer V $ 155 Per Hour Engineer IV $ 135 Per Hour Engineer III $ 120 Per Hour Engineer Il $ 105 Per Hour Engineer I $ 85 Per Hour Engineering Technician Designer II $ 100 Per Hour Designer I $ 75 Per Hour Technician IV $ 85 Per Hour Technician III $ 75 Per Hour Technician 1I $ 65 Per Hour Technician I $ 55 Per Hour Field Technician-Field Inspector Resident Project Representative(RPR) $ 120 Per Hour Inspector 11 $ 75 Per Hour Inspector I $ 65 Per Hour Field Surveying GPS Survey $ 175 Per Hour Surveyor $ 85 Per Hour Administrative Business Manager $ 85 Per Hour Expert Witness Preparation At Engineer's Hourly Rate Testimony,less than 1/2 day $1,000 Testimony,per Day $2,000 Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract Subconsultants/Outside Services Express Delivery,Field Supplies,Testing,Review/Filing Fees and Advertising Travel: Hotel and meals Actual Cost Vehicle* $0.545 per mile effective 1/1/18 Reproduction: Outside printing service Actual Cost In-house printing Letter Copy-B&W $ 0.10 Per Copy Letter Copy-Color $ 0.75 Per Copy 22 x 34 Size Copy-B&W $ 3.00 Per Copy 22 x 34 Size Copy-Color $10.00 Per Copy 1 1 x 17 Size Copy-B&W $ 1.50 Per Copy 11 x 17 Size Copy-Color $ 5.00 Per Copy CD Copy $ 5.00 Per Copy Binding $ 1.00 Each T To be adjusted periodically to current IRS mileage rate All Billings are due upon receipt unless prior arrangements for payment have been made.