Loading...
ORD NO 12-2016 CITY OF VAN BUREN,ARKANSAS ORDINANCE NO. IZ-2016 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS, AN ORDINANCE TO BE ENTITLED: AN ORDINANCE AUTHORIZING THE CITY OF VAN BUREN MUNICIPAL UTILITIES TO PROCEED WITH THE PURCHASE AND REPLACEMENT OF THREE BAFFLE CURTAINS LOCATED AT THE CITY'S MAIN (SOUTH) WASTEWATER TREATMENT PLANT DECLARING AN EMERGENCY AND WAIVING OPEN COMPETITIVE BIDDING. WHEREAS, the City of Van Buren Municipal Utilities has identified that all three baffle curtains in the lagoon at the City's Main(South) Wastewater Treatment Plant have become damaged and are no longer functioning as designed; and WHEREAS, a complete and thorough inspection has determined that all three baffle curtains cannot be repaired and should be replace; and WHEREAS, the replacement of all three baffle curtains is necessary in order to maintain the proper flow and retention of wastewater in the Main(South) Plant's treatment process; and WHEREAS, since the failure of the wastewater treatment process could cause adverse health effects and the City to be in non-compliance with the NPDES Permits, it is necessary to implement and complete replacement as soon as possible; and WHEREAS, a cost estimate has been prepared by JPS Industries and reviewed by professional engineers employed by the City of Van Buren Municipal Utilities Commission; and WHERAS, it would be impracticable and unfeasible to bid this project at this stage and the City needs to immediately begin construction of this project without any delays; and WHEREAS, the City of Van Buren Municipal Utilities Commission have by resolution, a copy of which is attached hereto,recommended that the City Council waive competitive bidding because of the urgent circumstances and authorize the City of Van Buren Municipal Utilities to employ a contractor to proceed with necessary purchase and replacement; and WHEREAS, Section 14-58-303 of the ARKANSAS CODE ANNOTATED provides that"The governing body, by Ordinance, may waive the requirements of competitive bidding in exceptional situations where such procedure is deemed not feasible or practical." NOW,THEREFORE,BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN,ARKANSAS,THAT: SECTION 1: The City Council hereby waives the requirements of competitive bidding for the above described project, as such a procedure is not deemed to be feasible or practical under the circumstances. SECTION 2: The Mayor and City Clerk hereby authorize the City of Van Buren Municipal Utilities to purchase materials and employ a contractor and to pay all expenses relating to this project. SECTION 3: The purchase of materials and employment of a contractor hereto is deemed and found to be necessary for the immediate preservation of health, safety and welfare of the City, and as such an emergency is hereby declared, and this Ordinance shall take effect and be in full force upon and after its passage and approval. IN WITNESS WHEREOF,the City of Van Buren, Arkansas, by its City Council, did pass, approve, and adopt, by a vote of(o for and O against, the foregoing Ordinance at its Regular Meeting held on the 19th day of September 2016. Robert D. Free 011111111.11"1" Mayor ATTEST: : 'PR elletkau ORM: PIYy lis Thomas an'ice A. Settle City Clerk/Treasurer City Attorney RESOLUTION A RESOLUTION RECOMMENDING THAT THE MAYOR AND CITY COUNCIL OF THE CITY OF VAN BUREN AUTHORIZE THE CITY OF VAN BUREN MUNICIPAL UTILITIES TO PROCEED WITH THE PURCHASE AND REPLACEMENT OF THREE BAFFLE CURTAINS LOCATED AT THE CITY'S MAIN(SOUTH) WASTEWATER TREATMENT PLANT DECLARING AN EMERGENCY AND WAIVING OPEN COMPETITIVE BIDDING WHEREAS,the City of Van Buren Municipal Utilities has identified that all three baffle curtains in the lagoon at the City's Main(South) Wastewater Treatment Plant have become damaged and are no longer functioning as designed,and WHEREAS,a complete and thorough inspection has determined that all three baffle curtains cannot be repaired and should be replaced,and WHEREAS,the replacement of all three baffle curtains is necessary in order to maintain the proper flow and retention of wastewater in the Main(South)Plant's treatment process,and WHEREAS,since the failure of the wastewater treatment process could cause adverse health effects and the City to be in non-compliance with the NPDES Permits,it is necessary to implement and complete replacement as soon as possible,and WHEREAS,a cost estimate has been prepared by JPS Industries and reviewed by professional engineers employed by the City of Van Buren Municipal Utilities Commission,and THE CITY OF VAN BUREN MUNICIPAL UTILITIES COMMISSION DOES HEREBY RECOMMEND: (1) That the City Council authorize the City of Van Buren Municipal Utilities Commission to employ a contractor to proceed until completion with the replacement of all three baffle curtains at the City's Main(South)Wastewater Treatment Plant, and (2) That the City Council waives the requirement of competitive bidding in this particular situation in that said requirement of open publically advertised bidding . =•ure is deemed not to be feasible or practical because time is of the essen • and it. necessary to proceed as soon as possible. PASSED this 16th day of August,2016. C.E.Dougan,CH, •N A'1-1'bST: ��GZ7" , 12642 Kathy Geppert,SECRETARY • iitdiel '..- , pit ,-. SLIN,) ., t : Aif 'A , IL yy 4 Rv gill) 5"' 40 4001. ,r t s. i Sk