Loading...
ORD NO 04-2016 CITY OF VAN BUREN,ARKANSAS ORDINANCE NO. q -2016 BE IT ENACTED BY THE CITY COUNCIL,FOR THE CITY OF VAN BUREN, ARKANSAS,AN ORDINANCE TO BE ENTITLED: AN ORDINANCE AUTHORIZING THE MAYOR TO CONTRACT FOR CERTAIN LEVEE REPAIRS, WAIVING BIDDING REQUIREMENTS, DECLARING AN EMERGENCY,AND FOR OTHER PURPOSES. WHEREAS, the city of Van Buren contains within its corporate limits approximately 1.5 miles of Crawford County's 22 miles of flood control levees, built by the U.S. Army Corps of Engineers in 1943 to protect the town from the devastation of flood waters;and WHEREAS, the annual inspections of the flood control levee system conducted by the City under the direction of the U.S.Army Corps of Engineers have generally found that the system remains in good condition; and WHEREAS, the most recent inspection of the levee revealed pipe erosion in under levee drainage system(Exhibit"A"); and WHEREAS, the U.S. Army Corps of Engineers has used Cambridgemoen LLC. of Gladewater, Texas, for similar repairs to the levee drainage in Corps maintained levee systems with good results; and WHEREAS, it would be impracticable to bid the repairs and the city needs to immediately begin repairs without any delays or any further action by the City Council; and WHEREAS, section 14-58-303 of the Arkansas Code Annotated provides that"The governing body,by Ordinance,may waive the requirements of competitive bidding in exceptional situations where such procedure is deemed not feasible or practical." NOW,THEREFORE,BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN,ARKANSAS,THAT: SECTION 1: The City Council hereby waives the requirements of competitive bidding for the above described repairs as such a procedure is not deemed to be practical under the circumstances. SECTION 2: The Mayor and City Clerk are hereby authorized to enter into an agreement (Exhibit"B")with Cambridgemoen LLC. of Gladewater,Texas,for the repairs to the levee drainage and to make necessary payments from Capital Improvement funds. SECTION 3: The repairs hereto are deemed and found to be necessary for the immediate preservation of health, safety and welfare of the city, and as such an emergency is hereby declared, and this Ordinance shall take effect and be in full force upon and after its passage and approval. IN WITNESS WHEREOF,the City/of Van Buren, Arkansas,by its City Council, did pass, approve, and adopt, by a vote of le for and c against, the foregoing Ordinance at its regular meeting held on the 22nd day of February : 6. Robert—I. Fi . Mayor ATTESTED: • PP ' 1 - .. 1 AS TO FORM: 41cuti 6/0.760... - it. Irli. 6, Barbie Curtis Candice A. Settle City Clerk/Treasurer City Attorney 1 1 .,NT OF tl+ , DEPARTMENT OF THE ARMY _, �,__ LITTLE ROCK DISTRICT, CORPS OF ENGINEERS K,,,,,._ qIC; i� POST OFFICE BOX 867 //P LITTLE ROCK,ARKANSAS 72203-0867 /�REPLY TO www.swl.usace.mil/ aTf 5°`A ATTENTION OF ett S 9 2015 Engineering and Construction Division Honorable Robert Freeman Mayor, City of Van Buren, Arkansas 1003 Broadway Van Buren,Arkansas 72956 Dear Mayor Freeman: The Corps conducts routine inspections to verify proper operation and maintenance of projects in its Rehabilitation and Inspection Program(RIP). The results of the recent routine inspection of the Van Buren Levee and Floodwall by the U.S. Army Corps of Engineers, Little Rock District are attached as Enclosure 1. We appreciate the regular maintenance that you perform on the levee. Because of work you regularly perform and the current condition of the levee, a"Minimally Acceptable" condition rating has been assigned to the levee. Based on this rating the project will remain active in the Corps' Rehabilitation and Inspection Program. The major areas of concern and recommendations for Van Buren Levee and Floodwall are presented in Table I below. The sponsor should carefully review the inspection report and make any necessary corrective actions - whether the item of concern was rated acceptable,minimally acceptable or unacceptable. Table I Routine Inspection—Items of Concern Van Buren Levee and Floodwall Item Rating Recommendations Encroachment(Embankment& M A number of encroachments were observed on or near the embankment. Floodwall) These include billboards,sand stockpiles,and utilities. The encroachments need to be removed or documentation should be provided to the Corps showing the unauthorized encroachments do not pose a threat to the embankment. Closure Structures(Floodwall) U Three stop log closure structures are located in the segment. The structures and components appeared to be in good condition,but no trial erection has been documented with the Corps in the past 6 years. Periodic trial erections of the stop log closures should be performed. Culverts/Discharge Pipe M The City provided video of the culvert interior in October 2015. The video did not show any settling or evidence of significant leaks;however,one of the culvert ends is corroded through,and the other culvert contains debris that renders the bottom unobservable. The Corps and the City discussed maintenance alternatives. The City currently plans to clear one culvert of the debris and re-video the pipe as well as investigating a lining option for the culvert with the corroded end section. These corrective measures should be completed prior to the next inspection currently scheduled for FY 2017. -2- To complete our records, we request that you provide a schedule of your corrective maintenance activities and any new levee board members within 30 days after the receipt of this letter. After you have reviewed the attached inspection report please contact us and we will gladly discuss any issue and provide technical support within our authority to assist you in making the required corrections to your levee. I am forwarding a copy of this letter to Ms. Mayra Diaz- Flood Plain Branch, FEMA Region 6, 800 North Loop 288, Denton, Texas 76209. If you have any questions regarding this report, please contact Elmo Webb at 501-324-5840. Sincerely, C4 Anthony J. Batey, PE Chief, Engineering & Construction Division Enclosure Cambridgemoen LLC. 4898 FM 1844 Gladewater Texas 75647 Phone:903-738-5682,Fax:903-295-1896 Quote TO: By: Name: Wayne Sandusky Name Shawn Earley Company: City of Van Buren Date: 11/11/2015 Address: 1003 Broadway AR 72956 Quote# 2511521 Email wsanduskv@vanbvrencitv.org Job# Phone: 479-471-5009 Van Buren Culvert Rehab Item No. Quantit Unit_Description of Item Unit Cost Total Price _ Install 18"HDPE into Host 24"CMP and Grout 001 140 LF annular space $ 214.00 $ 29,960.00 Install 32"HDPE into Host 36"CMP and Grout 002 180 annular space $ 258.00 $ 46,440.00 $ 76,400.00 Tax $ 2,226.39 Freight $ 3,000.00 Total $ 81,626.39' Quote Includes: Pipe,grout,Equipment and all labor and supplies needed to complete this Project Please fill free to call me at 903-738-5682 if further info is needed Shawn Earley Accepted : By: Date: Title: