Loading...
RES NO 09-01-2014 CITY OF VAN BUREN,ARKANSAS RESOLUTION NO. ( -j-2014 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN,ARKANSAS A RESOLUTION TO BE ENTITLED: A RESOLUTION ACCEPTING THE BID OF HOBBS CONSTRUCTION COMPANY, INC., FOR THE CONSTRUCTION OF A RESTROOM FACILITY AT THE DR. LOUIS PEER CITY PARK WITHIN THE CITY OF VAN BUREN, ARKANSAS; AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren recognizes the need to provide for the recreational needs and supporting facilities of its residents; and WHEREAS, in an effort to meet the recreational needs, the City recognizes the need for restroom facilities at the Dr. Louis Peer City Park; and WHEREAS, the City advertised and received bids for the restroom facility; and WHEREAS, the bids have been received and opened in accordance with Arkansas law and Hobbs Construction, Inc.,was the lowest bidder meeting the bid specifications; and WHEREAS, the City of Van Buren has determined that the bid of Hobbs Construction, Inc., after value engineering for the amount of$140,443.00,was the best bid. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS,THAT: SECTION 1: The City of Van Buren,Arkansas accepts the bid of$140,443.00 as submitted by Hobbs Construction,Inc., as set forth in"Exhibit A"attached hereto. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to pay all expenses from park improvement bond funds relating to this project and to execute all documents necessary to effectuate this resolution. IN WITNESS WHEREOF, the City of Van Buren, Arkansas, by its City Council, did pass, approve, and adopt,by a vote of G for and-0 against,the foregoing Resolution at its regular meeting held on the 15th day of September 2014. CTrai-i------"A-4— — Robert D.Fre Mayor ' 1• • 'PR 1 D A TO FORM: \A / Barbie Curtis Candice A. Settle be4A4-4inti City Clerk/Treasurer City Attorney HOBBS CONSTRUCTION COMPANY, INC. P.O. BOX 4094 FORT SMITH, AR. 72914 3 August 2014 City of Van Buren 1003 Broadway Van Buren, AR 72956 RE: Proposed new Restroom Building Van Buren Park Bob Freeman, I have reviewed the pricing on this project in order to bring down the cost of the new restroom building from the original bid amount to a figure the city could live with. As you know, we have taken out any pricing for any work that does not pertain to just the new restroom building that would be located across the street from the old swimming pool. The design and integrity of the building has stayed the same. I'll list the items below we did some changing in materials to save some money. Concrete: The building concrete itself was left alone, however, we took out the concrete parking surface and replaced it with just gravel or SB-2.There will still be one concrete parking spot for handicap accessibility. The metal roofing was deleted and replaced by architectural shingles. Phenolic core toilet partitions doors to be replaced with solid plastic doors, which are probably stronger anyway. The stainless steel toilet fixtures were replaced with white vitreous china with the exception of the exterior drinking fountain, which would move to a new location on the building. The price for this new restroom building and parking with utilities would be : $140,443.00. If you wish to change the exterior drinking fountain to normal steel you could deduct an additional $2,000.00. If I can be of service, please let me know. Sincerely, HOBBS CONSTRUCTION COMPANY, INC. RANDALL G. HOBBS