RES NO 10-04-2013 CITY OF VAN BUREN, ARKANSAS RESOLUTION NO.1 _4 2013 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS, A RESOLUTION TO BE ENTITLED: A RESOLUTION ACCEPTING THE BID OF GOODWIN GOODWIN, INC., FOR THE 2013 TENNIS COURT PROJECT, AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren has advertised for bids for the 2013 Tennis Court Project; and WHEREAS, bids have been received and opened in accordance with Arkansas law and Goodwin Goodwin, Inc., was the lowest bidder meeting the bid specifications; and WHEREAS, the City of Van Buren has determined that the bid of Goodwin Goodwin, Inc., is the best bid. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS, THAT: SECTION 1: The City of Van Buren, Arkansas accepts the bid of 56,800.00 as submitted by Goodwin Goodwin, Inc., as set forth in "Exhibit 1" attached hereto. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to pay all expenses relating to the 2013 Tennis Court Project and to execute all documents necessary to effectuate the agreement. IN WITNESS WHEREOF, the City of Van Buren, Arkansas, by its City Council, did pass, approve, and adopt, by a vote of to for and 0 against, the foregoing Resolution at its regular meeting held on the 21 day of October 21i 4 yam. i Robert D. Fre; an Mayor ATTESTED: AP VED AS TO FORM: Azac Barbie Curtis Candice A. ettle City Clerk/Treasurer City Attorney Bid Tabulation Tennis Court Project Bid Openning: 10/8/13 10:00 am Contractor Schedule I Bid Goodwin Goodwin 56,800.00 Melchor Construction 64,267.50 BID Bid of �,��00061114-Gc c W11 a corporation organized and existing under the laws of the State of A J/A( a partnership consisting of an individual trading as TO: CITY OF VAN BUREN 1003 BROADWAY VAN BUREN, ARKANSAS 72956 SCHEDULE I 2013 TENNIS COURT IMPROVEMENTS It is understood that the Total Basic Contract Price, in addition to all other work includes all Variable Quantities listed in the Bid in the amounts so listed. The Variable Quantities given in the Bid are for the purpose of comparing bids, and the Total Basic Contract Price will be adjusted in the final settlement for variation in these quantities at the following unit prices: Item Quantity Unit Amount No. and Unit Description Price of Bid 1. 1 LS 2013 TENNIS COURT IMPROVEMENTS FL Vy 5 ix C+40W► G&W l.°.P 0 d d$ 5 b a0n Dollars per lump sum TOTAL BASIC CONTRACT PRICE SCHEDULE I Dollars ($514 The undersigned hereby declares: That he has examined the Plans and the Specifications with the related documents and the site of the proposed work and being familiar with all conditions surrounding construction of the proposed project, including the availability of material and labor, hereby proposes to furnish all equipment, labor, material, and supplies, within the time set forth herein and at the prices stated above. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, of which this Bid is a part. The undersigned further agrees, if awarded the Contract for Schedule I, the Contractor will begin work within ten (10) calendar days following the issuance of a written notice to proceed and will fully complete all work within Sixty (60) consecutive calendar days thereafter. Should the Contractor fail to complete the work within the stated time, he shall pay the OWNER as fixed, agreed, and 1 Bid liquidated damages, the sum of $50.00 per day for each consecutive calendar day of delay until the work is completed or accepted. The undersigned submits the following subcontractors for use if the contract is awarded. The Owner shall have the authority to reject the use of any subcontractor. SUBCONTRACTORS NAME ADDRESS CONTRACTOR'S LIC. NO. Additional time is allowed for delays as stipulated in the Contract Documents. T l e undersigned acknowledges receipt of the following Addendum: For changing quantities of work items from those indicated by the Contract Documents, upon written instruction from the Engineer, the above unit prices as given in the Bid shall prevail. The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, bonds, etc., to cover the finished work of the various kinds called for. The bidder understands that the Owner reserves the right to reject any or all bids and to waive any informality in the bidding. The bidder does agree that this bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receipt of bids. C. JOCJ�UO\ n 0 LL-XT -e-C b y `-"Z YdA LSO o Ct W\.N SEAL: If Bidder is a Corporation Title AA-- 3 So3 TQ tQ5 f 1 S ttLI J'.1 72 Business Address Li9 tl,- "7 32 Telephone oc\ 6 N Arkansas License Number END OF BID t ,o >i ua y p `Nj (.3;�' eta s: f (5 :9 g •fir i; 2 Bid