Loading...
RES NO 03-02-1982 3.2 -1982. CITY OF VAN BUREN, ARKANSAS RESOLUTION NO. a 3 -1982 A RESOLUTION ACCEPTING BIDS FOR THE CONSTRUCTION OF THE STREET DEPARTMENT M AINTENANCE SHOP. WHEREAS, The Mayor has advertised for bids for the construction of the Street Department Maintenance Shop as per advertisement attached; and WHEREAS, Bids have been received as per the attached list; and WHEREAS, The Council feels that the bid of C.F. Stocks is the best bid for Schedule I, (Dirt Work); and WHEREAS, The Council feels that the bid of Delta Construction is the best bid for Schedule II, (Construction of Building), NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN, ARKANSAS: THAT, The Bid of C.F. Stocks in the amount of 4,200.00 is the best bid for Schedule I and is accepted. THAT, The Bid of Delta Construction in the amount of 37.347.00 is the best bid for Schedule II and is accepted. THAT, The Mayor is authorized and directed to execute contracts with the low bidders, and pay for same from Street Funds and General Revenue Sharing Funds. PASSED AND APPROVED THIS 15th DAY OF March 19 82 lekti MAYOR ATTESTED: C TY C E'K- TREASURER h 1'. r 't r (21i�, /ri c !i I Tr `I (t d r iT�� Err 1 Ar, I t Y E L 'f i VMN ryWrP rr: '.��W I It ±tlt 1 't I (Gi f t 1 n i'l City of Van l:, urea Arkansas ROBERT E. "GENE" BELL, Mayor Van Buren, Arkansas 72956 Phone 474 -1541 ..Legal notice Published in the February 25 and payment of $10.00 for each set, March 4,, 1982 issues of the Press .which is non-refundable: Argus. A five percent•(5 bid bond and a ADVERTISEMENT FOR BIDS one hundred percent, (100 Sealed separate bids for the performance and payment bond will construction of the Street berenuired. Department Shop building for the All bidders must be licensed City of Van Buren, Arkansas, will be contractors in the State of Arkansas. received.by the City of Van buren, at February 23, 1982 the office of the Mayor until 2:00 p.m. /s/ Robert "Gene" Bell local time, March 11, 1982, and then Mayor. City of Van Buren said bids will be opened and read 111 aloud. Construction will include. but not be limited to site work, floor slab, erection of existing metal frame building, and construction of'some component parts. The bid documents and specifications may be obtained at the office of Ronald R. Hawkins, Consulting Engineer, 514 'Main Street, Van Buren. _Arkansas, upon L BID SUMMARY VAN BUREN STREET DEPARTMENT MAINTENANCE SHOP 0 March 11, 1982 TOTAL AMOUNT PLAN HOLDER SCHEDULE I SCHEDULE .II OF BID 1. L H Construction Co. No Bid 37,464.00 2. Crawford Construction 10,000.00 49,968.00 59,968.00 3. Delta Construction 9,575.00 37,342.00 46,917.00 4. McConnell Construction 9,118.00 49,848.00 58,966.00 5. C.F. Stocks 4,200.00 No Bid 6. Terreco, Inc. No Bid 42,985.00 Schedule I C.F. Stocks 4,200.00 Schedule II Delta $37,342.00 TOTAL $41,542.00