RES NO 03-02-1982 3.2 -1982.
CITY OF VAN BUREN, ARKANSAS
RESOLUTION NO. a 3 -1982
A RESOLUTION ACCEPTING BIDS FOR THE CONSTRUCTION OF THE STREET DEPARTMENT
M AINTENANCE SHOP.
WHEREAS, The Mayor has advertised for bids for the construction of
the Street Department Maintenance Shop as per advertisement
attached; and
WHEREAS, Bids have been received as per the attached list; and
WHEREAS, The Council feels that the bid of C.F. Stocks
is the best bid for Schedule I, (Dirt Work); and
WHEREAS, The Council feels that the bid of Delta Construction
is the best bid for Schedule II, (Construction of Building),
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN,
ARKANSAS:
THAT, The Bid of C.F. Stocks in the
amount of 4,200.00 is the best bid for Schedule
I and is accepted.
THAT, The Bid of Delta Construction in the
amount of 37.347.00 is the best bid for Schedule
II and is accepted.
THAT, The Mayor is authorized and directed to execute contracts
with the low bidders, and pay for same from Street Funds and
General Revenue Sharing Funds.
PASSED AND APPROVED THIS 15th DAY OF March 19 82
lekti
MAYOR
ATTESTED:
C TY C E'K- TREASURER
h 1'. r 't r (21i�, /ri
c !i I
Tr `I (t d r
iT�� Err 1 Ar, I t
Y E
L 'f i VMN ryWrP rr:
'.��W I It ±tlt 1 't I (Gi f t 1 n i'l
City of Van l:, urea Arkansas
ROBERT E. "GENE" BELL, Mayor
Van Buren, Arkansas 72956 Phone 474 -1541
..Legal notice
Published in the February 25 and payment of $10.00 for each set,
March 4,, 1982 issues of the Press .which is non-refundable:
Argus. A five percent•(5 bid bond and a
ADVERTISEMENT FOR BIDS one hundred percent, (100
Sealed separate bids for the performance and payment bond will
construction of the Street berenuired.
Department Shop building for the All bidders must be licensed
City of Van Buren, Arkansas, will be contractors in the State of Arkansas.
received.by the City of Van buren, at February 23, 1982
the office of the Mayor until 2:00 p.m. /s/ Robert "Gene" Bell
local time, March 11, 1982, and then Mayor. City of Van Buren
said bids will be opened and read 111
aloud. Construction will include. but
not be limited to site work, floor slab,
erection of existing metal frame
building, and construction of'some
component parts.
The bid documents and
specifications may be obtained at the
office of Ronald R. Hawkins,
Consulting Engineer, 514 'Main
Street, Van Buren. _Arkansas, upon
L
BID SUMMARY
VAN BUREN STREET DEPARTMENT
MAINTENANCE SHOP
0 March 11, 1982
TOTAL AMOUNT
PLAN HOLDER SCHEDULE I SCHEDULE .II OF BID
1. L H Construction Co. No Bid 37,464.00
2. Crawford Construction 10,000.00 49,968.00 59,968.00
3. Delta Construction 9,575.00 37,342.00 46,917.00
4. McConnell Construction 9,118.00 49,848.00 58,966.00
5. C.F. Stocks 4,200.00 No Bid
6. Terreco, Inc. No Bid 42,985.00
Schedule I C.F. Stocks 4,200.00
Schedule II Delta $37,342.00
TOTAL $41,542.00