Loading...
RES NO 01-01-2012 CITY OF VAN BUREN, ARKANSAS RESOLUTION NO. 1 -2012 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN ARKANSAS, A RESOLUTION TO BE ENTITLED: A RESOLUTION TO AMEND RESOLUTION NO. 04 -03- 2006 TO AUTHORIZE THE MAYOR TO EXECUTE AN ADDENDUM TO THE ENGINEERING CONTRACT FOR THE RENA ROAD PROJECT; APPROPRIATING ADDITIONAL FUNDS; AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren, Arkansas pursuant to Resolution No. 4 -3 -2006 entered into a contract dated April 18, 2006, for Hawkins -Weir Engineer, Inc. to perform certain engineering services relative to Phase I of the Rena Road Improvement Project; and WHEREAS, additional engineering services will be necessary to facilitate the right of way acquisition of the project that will necessitate increasing engineering fees by $14,500.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS, THAT: Section 1: The Mayor is authorized by the City Council for the City of Van Buren to execute a contract amendment with Hawkins -Weir Engineers, Inc. to modify the original April 18, 2006, engineering contract. Section 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to expend up to $14,500.00 in additional engineering fees and expenses for the Rena Road Expansion Project. Section 3: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to execute all documents necessary to effectuate this Resolution. IN WITNESS WHEREOF, the City of Van Buren, Arkansas, by its City Council, did pass, approve, and adopt, by a vote of 5 for and 0 against, the foregoing Resolution at its regular meeting held on the 23` day of January, 2012. .1 Robert D. Freeman 4 Mayor ATTESTED: APPROVED AS TO FORM: lir Barbie Curtis i Candice A. Settle City Clerk Treasurer City Attorney HAW KIN S 4WE IR E N G I N E E R S I N C. Engineering Client Success January 17, 2012 Mr. Brad Baldwin, P.E. Mr. John Sharum, P.E. City Engineer Resident Manager, Barling Office City of Van Buren Arkansas Highway and Transportation Department 1003 Broadway P. O. Box 1424 Van Buren, Arkansas 72956 Fort Smith, Arkansas 72902 -1424 Re: Rena Road AHTD Job #040345 HWEI Project No. 02138C Gentlemen: You will find enclosed for your review and approval the scope of services for the plan revisions required to accommodate the deletion of the sidewalk from the roadway contract and the revisions to the Stage I and Stage 11 maintenance of traffic to reduce the Stage II maintenance of traffic lane width to 15' for one -way (west bound) traffic. This work will require an amendment of our engineering service contract. Our fee for these revisions will be a lump sum of $14,500.00. I am sending to Brad the formal contract amendment for his review and approval: We will commence work on these revisions immediately upon approval and complete the revisions within four (4) weeks. If you have any questions or comments, or if 1 have not included any work you feel is needed, please advise. Very Truly Yours, HAW EN INFERS, INC. G Ronald R. Hawkins, P.E., P.S. RRH /gch Enclosure: Scope of Services Cc: Ms. Lisa •Huckelbury tto So. 7th Street P.O. Box 648 Van Buren, AR 72957 Ph: (479) 474 -122 Fax: W79/474 200 River Market Ave. Suite 250 Little Rock,A Ph: (501) 374 -4846 Fax: (501)374 -4886 w wta. haw kips -we ir.eo m 02138C \B B,JS011712RH.doc Scope of Services Revisions to Rena Road Plans AHTD Job #040345 HWEI Project No. 02138C January 12, 2012 The following is the scope of work required to revise the existing construction documents on the referenced project to 1) delete the sidewalk from the scope of construction, and 2) to revise Stage II maintenance of traffic plan (which also requires changing the Stage 1 Plan) to call for one -way traffic (west bound) during Stage II by reducing the travel lane to 15' (including shoulder width). Plan Sheet Revisions Plan Sheet Comments Cover Sheet 1 Revision date only Index 2 Update as needed for revisions Typical Section 3 Note sidewalk deletion Special Details 4 Note sidewalk deletion Special Details 5 Remove sidewalk detail Method of Stage Construction 11 Revise Stage I and Stage II details Method of Stage Construction 12 Note sidewalk deletion and revise stage construction Maintenance of Traffic 13 Revise Stage I and Stage II maintenance of traffic, including signage Quantities 23 -27 Revise quantity tables as needed for revisions, including sidewalk removal, earthwork and pavement for stage construction revision, signage, etc. P P Sheets 33 -44 Note sidewalk deletion (sidewalk will remain on P P Sheets with note added "by others" Pavement Marking 45 -47 These sheets will not be revised Cross Sections 85 -107 Revise Stage I construction; note sidewalk deletion; revise earthwork quantities 02138C \Scope of Services Revisions to Rena Road Plans. docx