RES NO 08-05-1989 g -s- €189 CITY OF VAN BUREN, ARKANSAS RESOLUTION NO. 5 8 -1989 A RESOLUTION ACCEPTING THE ALTERNATE BID OF FORSGREN, INC. FOR REBUILDING AND OVERLAY OF RUDY ROAD FROM I -40 OVERPASS TO EAST CITY LIMITS. WHEREAS, The Mayor has advertised for bids for overlay and rebuilding of Rudy Road from I -40 Overpass to East City Limits; and WHEREAS, The attached bids have been received; and WHEREAS, The Council feels that the Alternate Bid of $95,777.00 of Forsgren, Inc. is the best bid: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN, ARKANSAS: THAT, The Alternate Bid of $95,777.00 of Forsgren, Inc. is accepted. THAT, The Mayor is authorized and directed to pay for same out of Capital Improvements Fund. PASSED AND APPROVED THIS 28TH DAY OF AUGUST 19 89 Gl LN"1 MAYO ATTESTED: A ce A4 CITY CLERK- TREASURER l �h� hoffman prieur Et associates, inc. 1.21:LJ land surveyors consulting engineers Ivan L Hoffman, Jr., Alvin L Prieur, Jr.. P.E. Mork). &een, P.LS. August 28, 1989 0 City of Van Buren City Hall Van Buren, Arkansas 72956 Attn: The Honorable Robert E. "Gene" Bell Mayor, City of Van Buren RE: Bids Rudy Road Improvements Van Buren, Arkansas Dear Mayor Bell: We have reviewed the bids received today on the above referenced project. The low "Base Bid" was from Crawford Construction Co. in the amount of $86,440.30. This is for the work as originally designed. The low "Alternate Bid" was from Forsgren, Inc. in the amount of $95,777.00. This is for an alternate to scarify and recompact the entire road before the overlay. This option will provide a better road for the future. A cost overrun could be possible with this alternate if problems are found during scarification of the existing pavement surface. We would recommend that the "Alternate Bid" in the amount of $95,777.00 be accepted and the contract awarded to Forsgren, Inc. If you have any questions, please contact me. I do plan on being at the council meeting tonight, if any questions arise during the meeting. I would recommend that we return the bond (cashier's check) from Tarkington Construction. Sincerely, HOFF PRIEUR ASSOCIATES, INC. Alvin L. Prieur, Jr., P.E. ALP /kh (501) 474 -7916 p.o. box 1226 von buren, orkonsas 72956 i s hoffman prieur associates, inc. land surveyors consuldng engineers Ivan L Hoffman. Jr., P.LS. Alvin L Prleur. Jr., P.E. Mork J. Breen, P.LS. BID SUMMARY Street Reconstruction Rudy Road Improvements Van Buren, Arkansas Bid: 10:00 a.m. August 28, 1989 BIDDER BOND BASE BID ALTERNATE BID Crawford Const. Associated Fort Smith, AR Indemnity $86,440.30 $98,845.50 Corp. 5% Forsgren, Inc. James Fort Smith, AR 5% $89,401.00 $95,777.00 JOB Const. Mid- Contient Poteau, OK 50 $99,733.10 $114,691.00 Tarkington Const. $5000.00 Fort Smith, AR Cashier's $91,808.52 $99,912.60 Check Engineers Estimate $91,500.00 $103,000.00 (501) 474 -7916 p.o. box 1226 von buren, orkonsos 72956