Loading...
RES NO 08-03-1990 /#5 990 CITY OF VAN BUREN, AKRNASAS RESOLUTION NO. cg'A -1990 A RESOLUTION ACCEPTING THE BID OF FORSGREN, INC. FOR WOOD STREET STREET IMPROVEMENTS AND POINTER TRAIL SIDEWALK IMPROVEMENTS. WHEREAS The Mayor has advertised for bids for Wood Street Street Improvements and Pointer Trail Sidewalk Improvements; and WHEREAS, The attached bids have been received; and WHEREAS, The Council feels that the bid of $61,780.40 of Forsgren, Inc. is the best bid. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN, ARKANSAS: THAT, The bid of $61,780.40 of Forsgren, Inc. is accepted. THAT, The Mayor is authorized and directed to pay for same out of Capital Improvements Fund. PASSED AND APPROVED THIS 20TH DAY OF AUGUST ,1990 MAYOR ATTESTED: 1s0 CIT _CLERK -TR SURER rh HAWKINS -WEIR ENGINEERS, INC. RONALD R. HAWKINS, P.E., R.LS. IENO1NEEflS=SOBVEY068 August 1, 1990 C. LARRYWEIR,P.E. BARRY K McCORMICK P.E. STEVEN R. HENDRIX BRETT D. PETERS, E.I.T. Honorable Gene Bell Mayor, City of Van Buren Van Buren Municipal Complex Van Buren, Arkansas 72956 Re: Wood Street Street Improvements Pointer Trail Sidewalk Improvements H -W Job Nos. VB -89 -36 and VB -90 -35 Dear Mayor Bell: Bids were received July 26, 1990 for the referenced project. The low bidder was Forsgren, Inc., with a total bid of $61,780.40. A copy of the certified bid tabulation is enclosed for your infor- mation and files. It is our recommendation that this bid be accepted, and that a Contract be awarded in the amount of $61,780.40. If you have questions or comments, please call. Very truly yours, HAWKINS- IR GINEERS, INC. /Si Ronald R. Hawkins, P. E. of VAfe Enclosure r A 6 copy: Forsgren, Inc. g+ AUG 0 21990 0 411 FAYETTEVILLE ROAD VAN BUREN, ARKANSAS 72956 FAX (501) 474 -8531 PHONE (501) 474.1227 TABULATION OF BIDS RECEIVED JULY 26. 1990 2:00 PM HAWKINS -WEiP. ENGINEERS, INC. JOB NOS. V0 -89 -26 ANO VB -90 -35 ("STREET IMPROVEMENTS WOOD STREET, SIDEWALK IMPROVEMENTS POINTER TRAIL WEST; CITY OF VAN BUREN, ARKANSAS SCHEDULE i. SECTION BIDDERS FORSGREN, INC. CRAWFORD CONSTRUCTION NO. DESCRIPTION OUAN UNIT AMOUNT 810 AMOUNT BID 1. RAISE MANHOLE LIDS 4 EA £87.00 $320.00 £75.00 1300.00 2. RAISE VALVE BOY 3 EA $60.00 5180.00 $45.00 $135.00 3. ELI VERT CLASS 'A° CURB S SUTTER 190 LF $8.00 $1,520.00 19,00 $1,710.00 4. GRADE DITCH 805 LF $3.00 $2,415.00 $1.90 $1,449.00 5. RR 15° RCP CLASS III 170 LF $20.00 $3,400.00 $19.00 $3,230.00 6. R&R 13' RCP CLASS III 28 LF 525.00 $700.00 119.00 $532.00 7. R£R 24' RCP CLASS III 28 LF $30.00 $840.00 124.00 $672.00 3. RI COMPACTED S8 -2 BASE COURSE 620 TN $12.29 $7,619.80 $10.00 $6,200.00 9. FRI HMAC 340 TN $32.89 $11,182.60 131.80 110,812.00 10. RI PRIME COAT 520 EL $1.10 $572.00 $1.20 $624.00 11. SCARIFY PULV EXIST PAVEMENT 1760 SY $2.85 $5,016.00 11.80 $3,166.00 12. GRADING SUBSRADE PREPARATION 6.8 ST $400.00 $2,720.00 $370.00 $2,516.00 13. RI CONL,•.0 2 FOR HEADWALLS 5 CY $500.00 $2,500.00 $400.00 $2,000.00 14. FE 6' GRAVEL DRIVEWAY 115 SY $3.00 $345.00 $5.50 $632.50 TOTAL SCHEDULE I, SECTION I $39,330.40 133,980.50 SCHEDULE I, SECTION II BIDDEERS FORSGREN, INC. CRAWFORD CONSTRUCTION NO. DESCRIPTION DUAN UNIT AMOUNT BID AMOUNT BID 1. Eli CONCRETE SIDEWALK, 4' THICK 10,000 SF 11.20 $12,000.00 $1.86 $10,600.00 2. FSI CONCRETE SIDEWALK, 6' THICK 1400 SF $1.50 52,100.00 $2.20 $3,080.00 3. REMOVE CURB GUTTER AND /OR 10 EA 180.00 1800.00 $200.00 $2,000.00 SIDEWALK TD INSTALL RAMP 4. MISCELLANEOUS SITE CLEARING, ETC 1 LS $3,500.00 $3,500.00 $1,500.00 11,500.00 5. F&1 HANDRAIL 50 LF 520.00 £1,000.00 $22.00 £1,100.00 6. F£I INLETS 2 EA $750.00 31,500.00 11,275.00 $2,550.00 7. SITE RESTORATION 1 LS 51,200.00 $1,200.00 11.500.00 51,500.00 8. CROSSWALK PAINTINS 2 EA 1175.00 1350.00 $1,500.00 53,000.00 TOTAL SCHEDULE 1, SECTION II 5 $2 TOTAL SCHEDULE I 161,780.40 567,210.50 1 hereby certif; 1 is b tabulation is a true and accurate representaticn of all bids received. Ronal R. Ha_ ins, P.E., Arkansas Reeistration No. 4017 Hawkins-Weir Engineers, Inc., 411 Fayetteville Road, Van Buren. 9r. 411