Loading...
RES NO 08-03-2026 CITY OF VAN BUREN, ARKANSAS RESOLUTION NO. L ? -0 - 2026 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS,A RESOLUTION TO BE ENTITLED: A RESOLUTION AUTHORIZING THE MAYOR TO AMEND THE CONTRACT FOR THE NORTHRIDGE DRIVE AND PARK RIDGE DRIVE OVERLAY PROJECT. WHEREAS, McKenzie Asphalt, LLC., was approved by the Van Buren City Council to start the Northridge Drive and Park Ridge Drive Overlay Project, pursuant to Ark. Code Ann. Section 19-11-801,and the Council further authorized the Mayor and City Clerk to enter into an agreement with McKenzie Asphalt,LLC.,to provide those services;and WHEREAS, an agreement with McKenzie Asphalt,LLC.,was entered into;and WHEREAS, one change order in the amount of $39,459.93 to the initial agreement has been submitted totaling$370,662.03. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS,THAT: SECTION 1: The Mayor and City Clerk are hereby authorized to execute the change order not to exceed$370,662.03 as set forth in Exhibit"A"hereto, and to pay all expenses relating to this project in accordance with the change order and the original agreement. IN WITNESS WHEREO ,the City of Van Buren,Arkansas,by its City Council,did pass, approve, and adopt,by a vote of for and against,the foregoing Resolution at its regular meeting held on the 24'day of August 6. D G\erk TreC7 f v.� S4�o Jose . st May City of Van Buren ATTESTED: d y0y APPROVED AS TO FORM: 0 o"ryCounty,Pt�a 2�5 !ona� . — Shawnna Reynold Jacob Howell City Clerk/Treasurer City Attorney PAYMENT APPLICATION NO.1(FINAL) Contractor: McKenzie Asphalt,LLC Van Buren 2023 Overlays Engineer; Neal Morrison Consulting, Vary wren,Arkansas Date, August 19.2026 Contract Amount: S 331,222A0 For work completed through August 7,2026 Cpntrt Complete to Percent Amount Item No. Description Unit. unit Cost Oate Coat let Complete 11 Mobilization 1 Lump SUM S 2,4Lt;'€,00 1 100% 2,Ott0= 2" Maintenance of Traffic and Traffic 1 Lump Siam $ 21250,00 1 1 $ 2,250,00 CazntroC 3. Tack Coat 710 Gallon S 3.50 960 135% 5 31360.00 4, ACHM Surface Course(Type 11 1,080 Tura S 120,20 1,503.91 139 S 180,769.93 5. Cold milling 10 to 21 Thickness) 9410 5q.yt. S 1,92 8,627 91% $ 16,56194 Thermoplastic Pavement Marking 210 Lin,.Ft, 0,90 200 95% $ 18O.CIt) (4"White) Thermoolastic Pavement Marking 163 Lin,Ft, ' ra 15.00 202 124% S 3,030.00 ? (24"White) Thefrooplastic Pavement Marl4ng 81100 Lin.Ft, S 0.90 7,924 98% S 7,131.60 g' 4 yellow Thermoplastic Pavement Marking 1 2 Each 27 0D 2 1.00 5 550.00 SUBTOTAL• NORTHRIDGE DR)V . $ 215,935.42 f otillitation 1 Lump Scam S 2,0D0.00 100% 5 21000,00 Mainterience of Traffic and Traff§r 1 Lurrsp Sum S 3;€)00.00 1 !00% 3,O00.00 11 Control 12. Tack Goat 2,400 Gallon S 3.50 2,400 100% $ 8,400.00 13, ACFfM Surface Course(Type 3) 1,010 Tar 121_;o 919,,63 91% $ 111,827,01 Thecrmoplastic Pavement Marking y.680 Lint ;S 0.90 Q402 94 S 3,961,8#7 Thermoplastic Pavement Marking 56 Lin,ft< $ 1S,i14 a6 jo0 ° S E€40Z0 4� 16, 2 Fite SUBTOTAL- PARK RIDGE IIDRtN < $ 154,946.61 Total Complete to Datei 111-911%1 370, 2.03 Less Previous Payments: p TOTAL DUE THIS APPUCA!iTfON. $ 370 68?,g3 Submitted by Contractor, �„ ' )'sate; '•• Approved by Engineer. 3 Bate: 8/19/202 Accepted by owner. r, Dates 'C CITY OF VAN BUREN,ARKANSAS RESOLUTION NO. :-Jft 2026 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS,A RESOLUTION TO BE ENTITLED: A RESOLUTION ACCEPTING THE BID OF MCKENZIE ASPHALT, LLC., FOR THE NORTHRIDGE DRIVE AND PARK RIDGE DRIVE OVERLAY PROJECTS; AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren has advertised bids for the Northridge Drive and Park Ridge Drive Overlay Projects through Neal Morrison Consulting, LLC.; and WHEREAS, bids have been received and opened in accordance with Arkansas law and McKenzie Asphalt, LLC., is the lowest bidder meeting the bid specifications. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS,THAT: SECTION 1: The City of Van Buren, Arkansas accepts the bid of $331,222.10, for the Northridge Drive and Park Ridge Drive Overlay Projects, as set forth in "Exhibit A" attached hereto. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to pay all drainage improvement expenses,not to exceed the amounts of the low bids submitted, as set forth in "Exhibit A" attached hereto. IN WITNESS WHEREOF,the CYor Van B e , Arkansas,by its City Council, did pass, approve, and adopt, by a vote of and., against, the foregoing Resolution at its regular meeting held on the 261h day of May 2026. G%erk TredsG �o^ J eph P urst City of Van Buren r ATTESTED: 01 ��y APPROVED AS TO FORM: ors County P��ao Shawnna Reynol s Jacob Howell City Clerk/Treasurer City Attorney NEAL MORRISONCONSULTING, LLC 479- € 9- 4"'7' 4t'rr;t.;i,w a7'1? April 24,202.6 Mr. Jahn k arstens City of Van Buren Street Superintendcnt. 1003 Broadway Van Buren,Arkansas 72956 RE: Northridge Drive and Park Ridge Drive Overlays Dear John, Attached, please find a copy of the certified bid tabulation for the subject project for the bid opening that was conducted April 23, 2026. The low bidder has been verified to be McKenzie Asphalt, LLC of Muldrow, Oklahoma with a bid of$331,222.10. Based on a review of this company's qualifications, I recommend that the City accept the low bid and award the contract to Mckenzie Asphalt, LLC. Upon acceptance of the bid by the City Council, executable copies of the project manual will be forwarded to the Contractor with a request that they sign the agreement and obtain bonds and insurance certificates. When they return the documents, the Mayor will sign the contract agreement on behalf ofthe City and we will proceed with the project. Please let me know if you have any questions or comments on this matter. Sincerely. Neal T. Morrison, P.E. Enclosure 1 $10 TA9utATtON Northridge Drive and park Ridge Drive:Overiays Certtfred Correct � C ';an8uren,Arkansas For Bids Received April 23.2026 _ McKenrie Asphalt,LtC Fatmen,Wrc Moore S!nmomce,her, Him No. Description Quant" unit unh Cost Total Cost unit Cost Tow Cost unit Cost I Total coat SCREVU111:Northridge Drive If �. 1. Mobitiaation 1 Lump Sum S 2,000>0C 3 2,000.00 S 8:500 X, 5 8.500,00. $ 4,OXDO S 4,0m,00 2. Maintenance of TraMc and Trafft Corrtrst Il Lump s4m, 5 2,250,00 S 2,250,0 $ 19,500.00 5 19,%0,00 S 6,Sm,00 S 6,5m,00 3. Tack Coat 710 Gallocs S 350 $ 2.485,00 5 0.01 S 7.10 S 4,00 S 2,840.E 4, CNM.Surface Course{Type 3) I'm `or, 5 12010 $ 2291816,00 S 118.00 S 127,440.00 S 122,00 $ 131,760;0 S. Colo M1114 0to 2"Thickness) %4W Sa ft $ 1.92 5 18,105 60 $ 3.15 $ 29,NA,50 5 6.50 S $1.295,DO 6= ermoptaatic Pavement Maki (4"White) 210 .,en_Ft. 5 0.90 $ 189,00 S 0.941 5 157.40 $ I-00 S 210,00, 7. Themyopinslic Payment'Marki (24"White} 253 i:in.f& S 15.00. S 2.445.00 $ 15,W I S 2,542.90 5 16.5C S 2,689.50 8. IThermopiostic pavement Mark) (4"Te1)aw) 8,100 in€t= S 0,90 S 7,29t100 $ 0,9415 7,63.4 00 S 1.0 1 S 8.100,40 S. Ttsarrruo Castle pavemeratMsrkl (Arrows) 2 Ea4h S 275,00 S 550,00 $ 286.w`5 511.tC0 S SD0.00 S 500.00 Subtotal-Sehedate 1(lterm 1 through 91t $ 166,1136.60 S 196,07710 y 217,993m kwou1E 2-Vark Ride Drive 10, Mobtiizattcn I Lwry Sum S 2.000,00 $ 2,000= $ 6,500.00 S 5,500.00 5 4.000.00 $ 4,O0fi.O- Il. McSntenance of Traffic and Traffic Comml 1 Lump Swo S 31OW100 $ 31000.00 S 17,506.00 $ 17,5C+C.00 $ 000-00 5 6,500.00 12. Tack Coat, 2,400 Gallon S 3.50 5 3,400.00 $ 0101 5 24.= S 4.00 $ 9,60OX0 1.3, ACHM Surface Course(Type 3) 1,040 Ton S 121.60 S 122.816:00 $ 120.00 $ 121,200.00 S 122.00 $ 123,220.0 14, Cold Milling 2to4"Thickraasj 8,710 $q,Fd. $ 2,35 $ 24,823,50 S 315 S 29,17850 $ 7,50 5 65,32S.00 is, Thermoplastic pa"ment Mark} (4"`Hallow) 4,680 Len.€t, $ 0.90 5 4,212,00 $ 0,94 $ 41399,20 $ 1.00 S 4,680,00 16, Thermoplastw paw#neitt Marks (24"White) 56 Cln,K, $ 15..00 S. "O'Clo S 15,60 S 37,3.60 $ 1630S 924,00 Subtotal-Schedule 2(Items 10 through 16)t 5 166,091.S0 S 179,67S.30 S 214,249,00 TOTAL 840 thews 1 through U6 3 331,222,30 $ 375,75330 $ 432,243.50