RES NO 07-04-2025 CITY OF VAN BUREN,ARKANSAS RESOLUTION NO.6 /- 2025 BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN, ARKANSAS, A RESOLUTION TO BE ENTITLED: A RESOLUTION ACCEPTING THE BID OF CRAWFORD CONSTRUCTION COMPANY, INC., FOR THE BEKAERT ROAD IMPROVEMENTS; AND FOR OTHER PURPOSES. WHEREAS, the City of Van Buren has advertised bids for the Bekaert Road Improvements through Hawkins-Weir Engineers, Inc.; and WHEREAS, bids have been received and opened in accordance with Arkansas law and Crawford Construction Company, Inc., is the lowest bidder meeting the bid specifications. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN,ARKANSAS, THAT: SECTION 1: The City of Van Buren,Arkansas accepts the bid of$1,433,667.00,for the Bekaert Road Improvements, as set forth in 'Exhibit A" attached hereto. SECTION 2: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to pay all road improvement expenses,not to exceed the amounts of the low bids submitted,as set forth in"Exhibit A" attached hereto. IN WITNESS WHEREOF,the Civlof Van Bur ,Arkansas,by its City Council, did pass, approve, and adopt,by a vote of for and against,the foregoing Resolution at its regular meeting held on the 28t'day of July 2025. C,\erk Treds4 City of Van Buren Mayor P. rst ATTESTED: d �ro' P�wa���y O FORM: County, Shawnna Reyn 1 s aco Howell City Clerk/Treasurer City Attorney r" HAWKI N S AWE I R ENGIN E E R S, I N Cm hvvx Engineering Client Success July 2, 2025 Honorable Joe Hurst, Mayor VIA EMAIL City of Van Buren, Arkansas 1003 Broadway Van Buren, Arkansas 72956 Re: Bekaert Road Improvements Project No. 2023083 Dear Mayor Hurst: Enclosed, please find a copy of the certified tabulation for six (6) bids received on Tuesday July 1, 2025, for the referenced project. The low bid was submitted by Crawford Construction Company, Inc. for a total contract price of $1,433,667.00, and the Engineer's estimate of the construction cost was $1,760,370.00. We have reviewed the bids and recommend that the City of Van Buren award a contract for the Bekaert Road Improvements project to the low bidder, Crawford Construction Company, Inc., for a total contract price of$1,433,667.00. We trust that this is satisfactory for your review and consideration. If you have any questions, or require any additional information, please do not hesitate to call. Sincerely yours, HAWKINS-WEIR ENGINEERS, INC. �Oz+ J. Kyle Salyer, P.E., P.S. JKS/mcw Enclosures: Certified Bid Tabulation for Project No. 2023083 Bid Opening Sign-In Sheet cc: Mr. John Karstens, Street Superintendent, City of Van Buren Travis Taylor, Schwob Building Company, LLC 1:10 So.7th Street • P.O. taox W • Van huren, AR 72957 • Ph:(479)474-1227 • Fax:(479)474-8531 211 Natural Resources Drive • Little Rock, AR 72205 • Ph:(50l)374-4846 516 East Milisap Road • Suite 103 e Fayetteville, AR 72703 Ph: (479)455-2206 403 Garri-,,n Avenue • Suite 1.01 • Fort Smith,AR 72901 • I?h:(479)24.2-4685 2023083\J H070225BAP.docx zt'zozv.hnwkiirs-zc,cir.coni i The City of Van Buren,Arkansas Bekaert Road Improvements : Tabulation of Bids Received on July 1,2025 HWEI Project No.2023083 t ,. SCHEDULE I-Street and Drainage Improvements Engineers Estimate Crawford Construction Company Harris United,LLC Goodwin 8 Goodwin,Inc. Curtis Construction Inc. Sleep Creek LLC Steve Beam Construct— Remy Description CITY Unit Unit cost Bid Unit Coat Bltl I Corrected Unit Cost Bid corrected Unit cast I Bid Corrected Unit Cost Bid Corrected Unit Cost Bid Unit Cost Bid 1- Performance and Payment Bond 1 LS $35,D00.00 $35,D00.00 $10,750.00 $10,75000 $15.000.00 S15,000.00 $42,000.00 $42,000.00 $40,000.00 $40,000.00 $42,000.00 $42,000.00 $20,420.00 $20.420,00 j 2. Maintenaxe of Traffic and Traffic Conad 1 LS $15,000.00 $15,000.00 $2,500.00 $2,500,00 $17.285.00 f17,285.00 $20,00000 $20,0D000 $15,250.00 $15,250.00 $9,500.00 $9,500,00 $24,700.00 $24,700,00 f` 3. Construction Erasion Control 1 LS $15,000.00 $15,000.00 $16.000.00 $16,000.00 $37,017.00 $37,017.00 $20,000.00 $20,00000 $18,000.00 $18,000.00 $68,435.00 $68,43500 $21.680.00 $21.68000 4. Site Preparation 1 LS $100.000.00 $100,000.00 $159,501.00 $159,501.DO $150,000.00 $150,000.00 $68,000.00 $68,000,00 $79.000.00 $79,000,00 $65,600.00 $65,600.00 $37,520.00 $37.520.00 5. Remove and Dispose of Asphalt Pavement 5,400 SY $8.00 $43,200,00 $8,50 S45,90000 $765 $41.310.00 $8.00 $43.200.00 $5.00 $27,000.00 $6.85 $36,990.00 $31.50 $170,100.0 6. Remove and Dispose of Existing Stamm Drain Pipes 330 LF $40.00 $13,200,00 $20.00 $6,600.00 $45.00 $14,850.00 $30.00 $9,900,00 $15.00 $4,950.00 $48.18 $15,899.40 $50.00 $16,500.00 7. Remove and Replxe 4'Babed Wire Fence 65 LF $40.00 $2,600,00 $30.00 $1,950.00 $60,00 $3,900.00 $10-DO $650,00 $45.00 $2,925.00 $14.37 $934.05 $20.00 $1,300.00 S. Clearing and Grubbing 2.3 STA $4,000,00 $9,200.00 $1,500.00 $3.450.00 $10.000,00 $23,000.00 $5.000.DO $11,500.00 $3,500.00 $8.050.00 $11.17.39 $25,800,00 $10,000.00 $23,000.00 9. Unclassified Excavator, 6,200 CY $20.00 $124,000,00 $9.00 $55.800.00 $1300 $80,600,00 $17.00 $105,400.00 $19.50 $120.900.00 $32.90 $203,98000 $20.00 $124,000. 30 % Select Material 6.200 CY $25.D0 $155,000.00 $29.50 $182,900.00 $25.00 $155,000.00 $36.00 $223.200-00 $33.00 $204.600.00 $50.61 $313,782.00 $40.00 $248,000.00 11. Trench or Excavator,Safety System 1 EA $13,500.00 $13,500.00 $100,00 $100.00 $20,000.00 $20,000.00 $20.000.00 $20,000.00 $2,500.00 $2,500.00 $42,000,00 $42,000.00 $12,750.00 $12.750.00 { 12. Subgrade Preparation 9.200 SY $10.00 $92,000.00 $4,25 $39,100.00 $8.00 $73,6D0.00 $5.00 $46,000.00 $5,00 $46,000.00 $3.92 $36,064.00 $15.00 $138.000.00 [ 13. Sdid Soddng 10,000 SY $70.00 $100,00000 $6.50 $85,000.00 $7.00 $70.000.00 $8.00 $80.000.00 $560 $56,000.00 $8.44 $84,40000 $1300 $130,00000 14. Class 7 Aggregate Base Course 2,100 CY $60.00 $126,000.D0 $76.70 $161,070.00 $55.00 $115,500.D0 $82.00 $172.200.00 $102.50 $215,250.00 E78.35 E160,335.00 3110.00 $231,00000 15. Prime Coat 1,000 GAL 56.00 $6,000.00 $4.20 $4,200.00 $4.60 $4.600.00 $5.00 $5,000.00 $16.25 $16,250.00 $5.00 $5.000.00 SC20 $4,200.00 16. ACHM Type 3 Surface Course 1,120 TON $150.00 $168,000.00 $122.00 $136.640,00 $138.00 $154,560.00 $12800 $140,000.00 $143.360.DO $195.00 $218,400.00 $149.11 $167,00320 $120.75 5135,24000 17. ACHM Type 2 Binder Course 1,120 TON $130.00 $145.600.00 $117.00 $131,040.00 $132.25 $4,60000 $148,120.00 $12300 $137,76000 $195.00 $218,400.00 $142.86 $160,003.20 $11550 $129,36000 18. Concrete Driveway(6'Thiclmass) 80 BY $90.00 $7,200.00 $124.00 $9,920.00 $150.00 $12,000.00 $140.00 $11.200.00 $132.00 $10,560.00 $125.75 $10,060,00 $122-00 $9,760.00 19. 11"RCP Class 111 22 LF $11,11 $1,980.00 1114,00 12,501,10 $110,10 $2,110,10 585.00 $1,171,00 117,10 $1,114,00 $112,91 $2,484.02 $121,00 $2,662,01 20. 24"RCP Class 111 64 LF $130.00 $8,320.00 $115.00 $7,360.00 $124.50 $7,968.D0 $125.00 $8,000.00 $147.00 $9,408.00 $177.88 $11,384.32 $164.00 $10,49600 21. 36'RCP Class III 72 LF $210.00 $15,120.00 $173.00 $12,456.00 $191.00 $13,752.00 $250.00 $18,000.00 $226.00 $16,272.00 $248.33 $17,879.76 $39000 $28,368.00 22. 48"RCP Class 111 64 LF $275,00 $17,600.00 $232.50 $14,880.00 $265.00 $16,960.00 $350.00 $22,400.00 $395,00 $25,280.00 $331.88 $21,240.32 $583.00 $37,312.00 23. 15"Flared End Section 2 EA $1,500.00 $3,000,00 3871.00 $1,742.00 MOM $1,800.00 $1,400,00 $2,800.00 $1,508.00 E3,016.00 $1,041.00 $2,082.00 $1,095.00 $2,190.00 24. 24"Flared End Section 2 FA $2,00000 $4,000.00 $1,000.00 $2,000.00 $1,200.00 :2,400.10 $1,500,00 $3,0D0.00 $2,133.. 34,266.00 $1,351,50 $2,703.00 $1.405.00 $2.810.00 25. 36"Flared End Section 2 EA $2,100.00 $5,000.00 $1,820.00 $3,640.00 $2,500.00 55,000.00 $3,800.00 $7,600.00 $3.900.00 $7,800.00 $2,586.00 E5,172.00 $2,640,00 $5.280,00 26. 48"Flared End Section 2 FA $4,000.00 $B,.0.00 43,500.00 $7,000.00 $5.250.00 $10,500.00 $4,000.00 $8,000.00 $4,600.00 $9,200.00 E4,912.50 $9,825.00 $5,600.00 $11,200.00 27. Thermoplastic Pavement Malang(Yellow 4") 4,400 LF $2.00 $8,800,00 $1.10 $4.840.00 $1.25 $5,5D000 $1.25 $5,500,00 $1.90 5.360.00 t1.25 $5,500.00 $1.05 $4,620 IN 28. Thamapl cPavenard M40.00 $1.25 $5,500.00 $1.25 $5,500,00 $1.90 $8,360.00 $7.25 $5,500. $1.05 $4,620.00 TOTAL BID-SCHEDULEalang(White 4') 4,400 LF $2.00 $8,800.00 $1.10 $4,8I f1,251,120.00 f1,093,8a8.00 N,093,887.00 51,065,082.00 $1,208,592.00 IN TOTAL) $1,242,040.01 S1,3t7,911.00 $1,397,911.00 $7,531,55&27 $1,587,088.00 SCHEDULE II-Water Improvements Engineer's Estimate Crawford Construction Company Harris United,LLC Goodwin S Goodwin,Inc. Curtis Conduction Ina Steep Creek LLC Steve Beam Constmctlon Item Description CITY Unit Unit Cost Bid Unit Cost Bid Corrected F$12.000D0 Bid Corrected Unit Cost Bid Corrected Unit Cost Bid Corrected Unit Cost Bid Unit Cost Bm 1. Remove and Replace 4'Babed Wre Fence 35 LF $40.00 $1,40000 $30.00 $1,050.00 $1,925.00 $10.00 $350.00 $55.00 $1.925.00 $21.89 $766.15 $21.00 $735.00 2. Water Pipe(12-mch,PVC,AWWA C900,Class 235)Open Cm 1,500 LF $108.00 $162,00000 $76.00 $114,000.00 $135,00000 $120.00 $160,00000 $100.44 $150,656.78 $150,660.00 $124.06 $186,09000 $99.75 $149.625.00 3. Water Pipe(8-inch,PVC,AW WA C900,Class 235)Open Cut 60 LF $95.00 $5,700.D0 $62.00 $3,720.00 $4.500.00 $100.00 $6,000.00 $86.D8 $5.164.82 $5,164. $88.43 $5,305.80 $63.00 $3,780,00 4. 12-inch Gate Valve with Box 3 EA $5,000.00 $15,000.00 $4,600DO $13,800.00 $17.685.00 $5,000.D0 $15,D00.00 $7,065.00 $21,195.00 $6.578.30 $19,734.90 $6,825.00 $20,47500 5. 8inch Gate Valve with Box 1 EA $2,500.00 $2,500.00 $2,600.00 $2,600.00 $12,000,00 $3,200.00 $3,20000 $4,325.00 $4,325.00 $3.948.12 $3,948.12 $4,200.00 $4,200.00 6. Tapping Sleeve and Valve(12-inch x 12-inch) 1 EA $15,000.00 $1500000 $12, .00 $12,000.00 $18,000.00 $12,000.00 $12,000.00 $13,978.00 $13,978.00 $12,328.22 $12.328.22 $12,075.00 $12,075.00 7. Fine Hydrant Assembly 5 EA $1 G.000.00 $5() () 0 $7,000.00 $35,000.00 $9,000.00 $45,000.00 $8,800.00 $44,000.00 $6,542.12 $32.710.60 $9.744.63 $48,723.15 $8,925.00 $44,625.00 S. Filengs 1,500 LB $ 10.00 $15.000.00 $0.01 $15.00 $6.50 $9,750.00 $0.01 $15.00 $72.57 S78,B55.00 $18.07 $27,105.00 $15.75 $23,625.00 TOTAL BID-SCHEDULE II $266,600.00 $182.195.00 $243,860.00 $260,565.00 f248,810.2D $24881340 $304,001.34 $259,140.00 Page 7.of 2 2023083\Certified Bid Tab 070125 The City of Van Buren,Arkansas Bekaert Road Improvements Tabulation of Bids Received on July 1,2025 HWEI Project No.2023093 SCHEDULE III-Sewer Improvements Engineers Estimate Crawferd Construction Company Harris United,LLC Goodwin 3 Goodwin,Ylo. Curds Construction Inc. Steep Creak LLC Steve Beam Constmadon Rom Description CITY Unit Unit Cost Bid Unit Coat Bid Corrected Unit Cost I Bid Comcted Unit Cost Bid Contacted Unit Cost aid Contacted UNt Cost Bid FS7.875.00 Bid 7. Gravel Drive Repair 220 By $70.00 $15.400.00 $16.00 $3,520.00 $17.00 S3,740.00 $25.00 S5,500.00 $4.00 $880.00 $11.18 52,459.60 $11550.00 2. Remove and Replace 6'Chain Link Fence 15 LF $100.00 S1,500.00 $5000 $750.00 $ 100.00 $1,500.00 $85.00 S7,275.00 $75.00 $1,125.00 S80.00 $1.20000 $472.50 3. Sanitary Sewer Trenching 9 Backa6ng(0-8'Deep) 915 LF $30.00 $27.450.00 $25.00 $22,875.00 S55.00 $50,325-00 575.00 $13.725.00 $10.00 $9.150.00 WAS 546,802.250 $20.822.50 4. Sanitary Sewer Trenching 6 Backr46ng Is-Deep) 630 LF $40.00 S25,200.00 $30.00 $18.000.00 $80.00 $50.400.00 S30.00 $18.900.00 $25.00 $15.750.00 $74.29 f46,802.700 $33,075,00 5. Sewer Poe(8-irch,PVC SDR 35) 1.545 LF $00,00 3123,600.60 S50.00 $77250.00 $12.00 $18,510,00 WOO $131,325,00 $75.19 $116J68.55 f38d6 $59.420.7C0 $64.890.00 8. Standard Depth Manhole(4-foot diameter.6 feet and less) 6 EA f6,500.00 $39.000,00 $4,750.00 $28.500.00 $7.750.00 $0.500.00 $5.500.00 $33,000.00 $7,826.00 M.956.00 $6,589.07 $39,534A20 $47,250.00 7. Additional Depth for Manhole 15 VF S800.00 $9,000.00 $200.00 $3,000.170 $150.00 $2.259.00 $325,00 $4.675.00 $325.00 $4.075.00 $275,00 f4.125.000 $7,87500 a. Connect to Existrg Wet Weil 1 EA ft 500.00 37500.00 $3,000.00 $3,000.00 $7,500.00 $7.500.00 $3,500.00 $350000 S2,575.00 $2.575.00 $5,535.00 55,535.00O $3,150.00 TOTAL BID-SCHEDULE III 5242,650.00 f167,7f6.00 $180,765.00 S212,700.00 $197,479.65 5205,879.67 $197,035.00 Engineers Estimate Crawford Construction Company Hard.United,LLC Goodwin i Goodwin,Inc. Curbs Co-t-tien Ma Steep Croak LLC Stave Beam C...h,Non TOTAL BID-SCHEDULE 1 $1,251,120.00 f1,093,696.00 f1,093,687.00 $1,066,062.00 $1,208,582.00 (NO TOTAL) $1,242,040.00 f1,757,811.00 57,397,1111AD $1,531,566.27 $1,687,089.00 TOTAL BID-SCHEDULE It $266,600.00 5/83,185.00 51p,a60.00 3260,888.00 S2N,810.20 1243,913.40 5304,001.74 f259,140.00 TOTAL BID.SCHEDULE III $242,650.00 a167,795.00 5180,755.00 5272,100.00 5187,479.65 $206,879.67 $1971011SM TOTAL BID-SCHEDULES I,It AND III $1,760,370.00 $1,433,686.00 51,433,687.00 $1A89,677.60 $1,633,197A0 $1,711,745.00 f7,714,705.00 f1,t104,200.7s Si,a46,203.95 32,041,43728 52,043,319.00 I hereby certify that this tabulation is a true and accurate representation of all bids received. jt�SZATE NF-Y �t9f AR S R iSTER- R FESS10NAI ENGINEER `✓�h No.12036.y lI J.Kyle Salyer,P.E.,P.S. Hawkins-Weir Engineers,Inc. Arkansas License No.12036 Page 2 of 2 2023083%Certified Bid Tab 070125 City of Van Buren,Arkansas Bekaert Road Improvements n.r Bid Opening;r �`c•r Tuesday,luly 1, 2025, 10:00 a.m. HWEI Project No. 2023083 SIGN-IN SHEET NAME COMPANY PHONE FAX MOBILE EMAIL Honorable Joe Hurst City of Van Buren, Arkansas 479.474.1541 John Karstens City of Van Buren, Arkansas 479.471.5009 jarstens@vanburencity.org J. Kyle Salyer, P.E., P.S. Hawkins-Weir Engineers, Inc. 479.474.1227 479.474.8531 479.883.1139 kyle.salyer@hawkins-weir.com Blake A. Peacock, P.E. Hawkins-Weir Engineers, Inc. 479.455.2206 479.474.8531 479.883.1381 blake.peacock@hawkins-weir.com Bryan Goodwin Goodwin & Goodwin, Inc. 479.651.7321 pipedude08@yahoo.com `7oE moo 2 1-'� Harris United LLC 479.322.8988 Bonny@harrisunited.com Laramie DeFries zd&� Steve Beam Construction 479.484.1634 Idefries@stevebeamconstruction.com Kevin Kelton Forsgren, Inc 479.782.1061 kkelton@forsgreninc.com GGeg..Gr-a�l f�4���c✓Ix Crawford Construction Company 479.474.9955 greg@crawford-construction.com &J;/(Z14ef_k +' h shawn-sthrum Emery Sapp& Sons Asphalt 479.466.6005 shawn.shrum@emerysapp.com Wesley Byrd Byrd Dozer Service, Inc. 479.414.2450 byrddozer@gmail.com Danny Roy Curtis Construction, Inc. 479.858.1319 dannyr@curtis-inc.com -Dion-Reid Steep Creek LLC 870:'503304 -dfeid@steepereekllc.com 2023083\Bid Opening Sign-In Sheet 070125.xlsx Page 1 City of Van Buren,Arkansas o Bekaert Road Improvements Bid Opening Tuesday,July 1, 2025, 10:00 a.m. �r HWEI Project No. 2023083 SIGN-IN SHEET NAME COMPANY PHONE FAX MOBILE EMAIL Jennifer Roberts Mobley Contractors, Inc. 501.354.2510 jroberts@mobleycontractors.com 2023083\Bid Opening Sign-In Sheet 070125.xlsx Page 2