Loading...
ORD NO 21-2024 CITY OF VAN BUREN,ARKANSAS ORDINANCE NOA I -2024 BE IT ENACTED BY THE CITY COUNCIL,FOR THE CITY OF VAN BUREN,ARKANSAS AN ORDINANCE TO BE ENTITLED: AN ORDINANCE ALLOCATING AND APPROPRIATING INSURANCE PROCEEDS FOR REPAIRS TO THE VAN BUREN SENIOR CENTER AND THE VAN BUREN LIBRARY BUILDING; AUTHORIZING THE MAYOR TO CONTRACT FOR ROOF REPAIRS AND IMPROVEMENTS; WAIVING BIDDING REQUIREMENTS; DECLARING AN EMERGENCY; AND FOR OTHER PURPOSES. WHEREAS, the Van Buren Senior Center and Library Building suffered roof damages from a hailstorm,which now need immediate repairs;and WHEREAS, the City of Van Buren has insurance proceeds, which will cover all of the repairs necessary; and WHEREAS, the City Council has determined, pursuant to A.C.A. § 14-58-303(b)(2)(B), that exceptional circumstances exist which render the competitive bidding process impractical and unfeasible. NOW,THEREFORE,BE IT ORDAINED AND ENACTED BY THE CITY COUNCIL OF THE CITY OF VAN BUREN,ARKANSAS,THAT: SECTION 1: The City of Van Buren, Arkansas, has an immediate need to repair storm damage to the Senior Center for$45,428.42 and Van Buren Library for$45,198.71, from Elite Roofing, for the total sum of$90,627.13. SECTION 2: Pursuant to A.C.A. § 14-58-303(b)(2)(B),the City Council hereby waives the requirement of competitive bidding and directs the Mayor to enter into contract described in"Exhibit A"for the price set forth in Section 1 above. SECTION 3: Due to the immediate need to best serve, protect, and preserve the public health, safety, and welfare of the citizens of the City of Van Buren, an emergency is declared to exist and this ordinance shall take effect from and after its passage and approval. SECTION 4: The Mayor and City Clerk are hereby authorized by the City Council for the City of Van Buren to execute all documents,contracts,and agreements necessary to effectuate this Ordinance. IN WITNESS WHEREOF,the City of Van Buren,Arkansas,by its City Council,did pass, approve,and adopt,by a vote of -for and against,the foregoing Ordinance at its regular meeting held on the 28`"day of October 2024. I G-W k Teas City of Van Buren seph . Hurst ayor AT �h�UrryCounty,P00a0h PRO amf�c Shawnna Rey of s Jaco ow City Clerk/Treasurer orney 'i I aeau�rKnu m:u +aas •+` Elite Roofing Estimate 1 IIII�hII ELITE ROOFING 09/19/2024 g; �q �t 3407 Industrial Claim Information EAr r E RO G Park Rd. Other t Van Buren,AR j 72956 Phone:(479)478- 8668 i Fax:(479)242- 2379 Ryan Weidman City of Van Buren 1409 Main Street Van Buren,AR 72956 (479)208-0948 i Roofing Section Remove existing shingles down to deck. Re-nail any loose wood. If bad or rotten wood is discovered,It will be replaced at a price of$75 per sheet. Install 3'of Ice and Water shield at all valleys I Install underlayment to keep your roof dry. Install Starter Shingles along all gutter lines and rake edges, j Install Architectural Shingles per specifications using 1'/a"roofing nails. Install Ridge Shingles Install new ventilation. Install all pipe and chimney flashings. I Clean up all job-related debris I Provide 5 year workmanship warranty and provide owner with a Shingle manufacturer Warranty if requested. Estimate is good for 30 Days our Crews are licensed and insured. � They will perform a 10 point clean up when the work Is done. -Crews will maintain safety requirement at all times during the construction process i Qty Unit Architectural Shingles i Tamko Titan XT 180.00 SQ j 3-Tab Shingles Tamko Elite Glass Seal AR 5,00 BD Starter Tamko Starter Shingle-10"(100') 7.00 HD i Drip Edge ACM Aluminum Drip Edge-.019-1.85"(10') 70,00 PC I Underlayment Synthetic Felt-Store Brand 19.00 EA i i House Brand Ice and Water 15.00 RL ? I Fasteners I 1 I I Roofing Coil Nails-1 1/4"(7200 Cnt) 9.00 8X 20 SQ/bx If SCHR Stainless Steel Staples-3/8'(5000 Cnt) 9.00 BX I 1 Ventilation ' Lomanco OR4 Ridge Vent With Screen and Nails(4') 30.00 PC l i Flashing Galvanized Steel Base Pipe Flashing-1 1/2"-3"-Mill Finish 6.00 EA Sealant I i I i r ,' 1 NPC 900 Solar Seal(10.3 oz) 3.00 EA Labor I { Tear off Shingles and Felt and Install Laminated Shingles 184.00 SQ I Install ice and water on ALL rakes and eves and on ALL side wall flashings 842.00 LF I � $45,198.71 TOTAL $45,798 71 i The Customer Acknowledges: 1.The customer has read this contract,has received a copy of this agreement,and agrees that it is a legal and binding contract.No oral terms or agreements supersede this written agreement. 2.Any surplus material shipped to the job site belongs to Elite Roofing.Customers will supply the electricity and accessways necessary to perform work. 3.The company will perform all work In a workman-like manner according to the local building code and manufacturer's specifications. 4a.Upon delivering the materials,the customer agrees to pay 50%of the contract and the balance when the work Is completed. ; 4b.Upon delivering materials to an insurance job,the first check Is required,and the second check is due when recovered from insurance if not prior to the i completion of services. 5a. The customer hereby understands and acknowledges that additional damage and/or repairs maybe made during the Inspections process and/or the construction process after the initial/original contract is signed by the customer.If additional damage is found an/ar additional repairs are made during the inspection processor during the construction process(this includes anything discovered by Elite Roofing's Insurance Specialist and/or the customer's Insurance company)the customer hereby understands and acknowledges that additional fees/charges will he added In addition to the initial/original contract price and will be paid to Elite Roofing by the customer or insurance company in the form of a supplement.—initial 5b.The customer hereby understands and acknowledges that pricing increases for materials and/or supplies purchased by Elite Roofing for this particular job may occur after the initial/original contract is signed by the customer.Any such pricing increases will be determined by Elite Roofing's Insurance Specialist and/or the customer's insurance company.If any pricing increases do occur after the initial/original contract Is signed by the customer,the customer understands and acknowledges that additional fees/charges will be added to the to the initial/original contract price and shall be paid to Elite Roofing by the customer or the customer's insurance company in the form of a supplement.Initial 6.Unless otherwise stated,no provision has been made to replace rotten or deteriorated decking.If such a condition arises there will be an additional charge of$75 per 48 sheet. 7.The customer agrees that new shingles will take the shape of the existing decking structure,which may or may not be even. 8.Driveway waiver:customer agrees to allow the use of the driveway for product delivery and disposal and agrees to hold the company and material suppliers harmless for any damage to the surface areas. I 9.The company is not responsible for repairing/replace any other items other than those listed above in the scope of work. j 10.The customer may cancel with Elite Roofing if done so IN WRITING within 3 days of contract.If canceled,the customer agrees to pay any restocking fees that may be Incurred. 11.The customer agrees the company is not responsible for Interior damage if Incurred during the standard construction process.The customer is advised to move objects away from walls and remove wall-hanging Items to avoid falling. 12.Roofing scheduling and completion contingent on weather. Satellite System Disclosure If you have a satellite system installed,we will remount it to your roof upon your request.However,you may need to contact your service provider to I calibrate the satellite which may result In additional charges.It is hest to consult with your insurance to discuss if these fees are covered in your policy. Electrical,Hvao,Refrigeration,Plumbing,etc line...Disclosure Elite Roofing will in no way be responsible for any damage that occurs frorn Fasteners protruding through the roof deck and damaging in any way a line that is run against said roof deck or a rafter.Your Elite roofing representative can inspect your attic to avoid this situation but said inspection still does not deem elite roofing responsible for any damage described in this fashion I IMPORTANT NOTICE TO OWNER" I UNDERSTAND THAT EACH CONTRACTOR,SUBCONTRACTOR,LABORER,SUPPLIER,ARCHITECT,ENGINEER,SURVEYOR,APPRAISER,LANDSCAPER, ABSTRACTOR,OR TITLE INSURANCE AGENT SUPPLYING LABOR,SERVICES,MATERIAL,OR FIXTURES IS ENTITLED TO A LIEN AGAINST THE PROPERTY IF NOT PAID IN FULL FOR THE LABOR,SERVICES,MATERIALS,OR FIXTURES USED TO IMPROVE,CONSTRUCT,OR INSURE OR EXAMINE TITLE TO THE PROPERTY EVEN THOUGH THE FULL CONTRACT PRICE MAY HAVE BEEN PAID TO THE CONTRACTOR.I REALIZE THATTHIS LIEN CAN BE ENFORCED BY THE SALE OF THE PROPERTY IF NECESSARY.I AM ALSO AWARE THAT PAYMENT MAY BE WITHHELD TO THE CONTRACTOR IN THE AMOUNT OF THE COST OF ANY SERVICES,FIXTURES,MATERIALS,OR LABOR NOT PAiD FOR.I KNOW THAT IT IS ADVISABLE TO,AND I MAY,REQUIRE THE CONTRACTOR TO FURNISH TO ME A TRUE AND CORRECT FULL LIST OF ALL SUPPLIERS AND SERVICE PROVIDERS UNDERTHE CONTRACT,AND i MAY CHECK WITH THEM TO DETERMINE IF ALL MATERIALS,LABOR,FIXTURES,AND SERVICES FURNISHED FOR THE PROPERTY HAVE BEEN PAID FOR,I MAY ALSO REQU1RETHE CONTRACTOR TO PRESENT LIEN WAIVERS BY ALL SUPPLIERS AND SERVICE PROVIDERS,STATING THATTHEY HAVE BEEN PAID IN FULL FOR SUPPLIES AND SERVICES PROVIDED UNDER THE CONTRACT,BEFORE I PAY THE CONTRACTOR IN FULL.IF A SUPPLIER OR OTHER SERVICE PROVIDER HAS NOT BEEN PAID,I MAY PAY THE SUPPLIER OR OTHER SERVICE PROVIDER AND CONTRACTOR WITH A CHECK MADE PAYABLE TO THEM JOINTLY, j IF VENTILATION IS NOT INSTALLED PER MANUFACTUARER SPECIFICATION,THERE WILL BE NO MANUFACTUARY WARRANTY _ SIGNED:_X OWNER/OWNER'S REGISTERED AGENT/OWNER'S AUTHORIZED AGENT ADDRESS OF PROPERTY DATE: I HEREBY CERTIFY THAT THE SIGNATURE ABOVE IS THAT OF THE OWNER,REGISTERED AGENT OF THE OWNER,OR AUTHORIZED AGENT OF THE OWNER OF THE PROPERTY AT THE ADDRESS SET OUT ABOVE. I r REPRESENTATIVE FOR KDBS GROUP,LLC d/b/a ELITE ROOFING OF ARKANSAS i DATE: i i I i i 1. i i i t t I e- r z ro8r<,: Elite Roofing Estimate 1 ELITE ROOFING 09/19/2024 3407 Industrial Claim Information ELITE ROOFING Park Rd. Other Van Buren,AR (479)478.8668 72956 Phone:(479)478- 8668 Fax:(479)242- 2379 j Ryan Weidman City of Van Buren 1800 Lafayette Street Van Buren,AR 72956 (479)208-0948 Roofing Section { Remove existing shingles down to deck. Re-nail any loose wood. If bad or rotten wood is discovered,it will be replaced at a price of$75 per sheet. Install X of Ice and Water shield at all valleys Install underlayment to keep your roof dry. Install Starter Shingles along all gutter lines and rake edges. Install Architectural Shingles per specifications using 1 v+"roofing nails. Install Ridge Shingles Install new ventilation. Install all pipe and chimney flashings. Clean up all job-related debris Provide 5 year workmanship warranty and provide owner with a Shingle manufacturer Warranty if requested. Estimate is good for 30 Days Our Crews are licensed and insured. - They will perform a 10 point clean up when the work is done. Crews will maintain safety requirement at all times during the construction process Qty Unit Architectural Shingles j Tamko Titan XT 154.33 SQ 3-Tab Shingles I Tamko Elite Glass Seal AR 10.00 BD Starter 1( Tamko Starter Shingle-10'(100) 10.00 BD (' Undedayment f Synthetic Felt-Store Brand 32.00 EA House Brand Ice and Water 23.00 RL Fasteners Roofing Coil Nails-1 1/4'(7200 Cnt) 8.00 BX 20 SQ/bx SCHR Stainless Steel Staples-3/8'(5000 Cnt) 16.00 BX Ventilation I Lomanco OR4 Ridge Vent With Screen and Nails(4) 52.00 PC Flashing I Galvanized Steel Base Pipe Flashing-1 1/2'-3'-Mill Finish 7.00 EA Step Flashing(Covers 50') 5.00 BD Split Boot 1.00 EA { ACM Aluminum Drip Edge-.019-1.85'(10') 87.00 PC r ' a Paint ' Generic Touch Up Spray Paint(12 oz) 1.00 EA Sealant NPC 900 Solar Seal(10.3 oz) 1.00 EA Labor Tear off Shingles and Felt and Install Laminated Shingles 164.33 SQ Double Felt entire roof 164.33 EA Install Ice and Water on ALL rakes,eves,ridges,behind all new step(lashings and around all 1345.00 LF jpenetrations Reflash all side walls&Roof Ventilators 254.00 LF r $45,428.42 TOTAL $45,428.42 The Customer Acknowledges: 1.The customer has read this contract,has received a copy of this agreement,and agrees that it Is a legal and binding contract.No oral terms or agreements supersede this written agreement. 2.Any surplus material shipped to the job site belongs to Elite Roofing.Customers will supply the electricity and accessways necessary to perform work. 3.The company will perform all work in a workman-like manner according to the local building code and manufacturer's specifications. 4a.Upon delivering the materials,the customer agrees to pay 50%of the contract and the balance when the work is completed. 4b.Upon delivering materials to an insurance job,the rust check is required,and the second check is due when recovered from insurance if not prior to the completion of services. 5a. The customer hereby understands and acknowledges that additional damage and/or repairs may be made during the inspections process and/or the construction process after the initial/original contract is signed by the customer.If additional damage is found an/or additional repairs are made during the inspection process or during the construction process(this includes anything discovered by Elite Roofing's Insurance Specialist and/or the customer's insurance company)the customer hereby understands and acknowledges that additional fees/charges will be added in addition to the initial/original contract price and will be paid to Elite Roofing by the customer or insurance company in the form of a supplement._Initial 5b.The customer hereby understands and acknowledges that pricing increases for materials and/or supplies purchased by Elite Roofing for this particular job may occur after the initial/original contract is signed by the custorner.Any such pricing increases will be determined by Elite Roofing's Insurance Specialist and/or the customer's insurance company.if any pricing increases do occur after the initial/original contract is signed by the customer,the customer understands and acknowledges that additional fees/charges will be added to the to the initial/original contract price and shall be paid to Elite Roofing by the customer or the customer's insurance company in the form of a supplement.Initial 6.Unless otherwise stated,no provision has been made to replace rotten or deteriorated decking.If such a condition arises there will be an additional charge of$75 per 4x8 sheet. 7.The customer agrees that new shingles will take the shape of the existing decking structure,which may or may not be even. 8.Driveway waiver:customer agrees to allow the use of the driveway for product delivery and disposal and agrees to hold the company and material suppliers harmless for any damage to the surface areas. 9.The company is not responsible for repairing/replace any other items other than those listed above in the scope of work. 10.The customer may cancel with Elite Roofing if done so IN WRITING within 3 days of contract.If canceled,the customer agrees to pay any restocking fees that may be incurred. 11.The customer agrees the company is not responsible for interior damage if incurred during the standard construction process.The customer is advised to move objects away from walls and remove wall-hanging items to avoid falling. 12.Roofing scheduling and completion contingent on weather. Satellite System Disclosure If you have a satellite system installed,we will remount it to your roof upon your request.Ilowever,you may need to contact your service provider to calibrate the satellite which may result in additional charges.It is best to consult with your insurance to discuss if these fees are covered in your policy. Electrical,Hvac,Refrigeration,Plumbing,etc line...Disclosure Elite Roofing will in no way be responsible fo-any damage that occurs from Fasteners protruding through the roof deck and darnaging in any way a line that is run against said roof deck or a rafter.Your Elite roofing representative can inspect your attic to avoid this Situation but said inspection still does not deem elite roofing responsible for any damage described in this fashion IMPORTANT NOTICE TO OWNER" I UNDERSTAND THAT EACH CONTRACTOR,SUBCONTRACTOR,LABORER,SUPPLIER,ARCHITECT,ENGINEER,SURVEYOR,APPRAISER,LANDSCAPER, ABSTRACTOR,OR TITLE INSURANCE AGENT SUPPLYING LABOR,SERVICES,MATERIAL,OR FIXTURES IS ENTITLED TO A LIEN AGAINST THE PROPERTY IF NOT PAID IN FULL FOR THE LABOR,SERVICES,MATERIALS,OR FIXTURES USED TO IMPROVE,CONSTRUCT,OR INSURE OR EXAMINE TITLE TO THE PROPERTY EVEN THOUGH THE FULL CONTRACT PRICE MAY HAVE BEEN PAID TO THE CONTRACTOR.I REALIZE THAT THIS LIEN CAN BE ENFORCED BY THE SALE OF THE PROPERTY IF NECESSARY.I AM ALSO AWARE THAT PAYMENT MAY BE WITHHELD TO THE CONTRACTOR IN THE AMOUNT OF THE COST OF ANY SERVICES,FIXTURES,MATERIALS,OR LABOR NOT PAID FOR.I KNOW THAT IT IS ADVISABLE TO,AND I MAY,REQUIRE THE CONTRACTOR TO FURNISH TO ME A TRUE AND CORRECT FULL UST OF ALL SUPPLIERS AND SERVICE PROVIDERS UNDER THE CONTRACT,AND I MAY CHECK WITH THEM TO DETERMINE IF ALL MATERIALS,LABOR,FIXTURES,AND SERVICES FURNISHED FOR THE PROPERTY HAVE BEEN PAID FOR.I MAY ALSO REQUIRE THE CONTRACTOR TO PRESENT LIEN WAIVERS BY ALL SUPPLIERS AND SERVICE PROVIDERS,STATING THAT THEY HAVE BEEN PAID IN FULL FOR SUPPLIES AND SERVICES PROVIDED UNDER THE CONTRACT,BEFORE I PAY THE CONTRACTOR IN FULL.IF A SUPPLIER OR OTHER SERVICE PROVIDER HAS NOT BEEN PAID,I MAY PAY THE SUPPLIER OR OTHER SERVICE PROVIDER AND CONTRACTOR WITH A CHECK MADE PAYABLE TO THEM JOINTLY. IF VENTILATION IS NOT INSTALLED PER MANUFACTUARER SPECIFICATION,THERE WILL BE NO MANUFACTUARY WARRANTY_ SIGNED:_X L OWNER/OWNER'S REGISTERED AGENT/OWNER'S AUTHORIZED AGENT ADDRESS OF PROPERTY DATE: I HEREBY CERTIFY THATTHE SIGNATURE ABOVE IS THAT OF THE OWNER,REGISTERED AGENT OF THE OWNER,OR AUTHORIZED AGENT OF THE OWNER OF THE PROPERTY AT THE ADDRESS SET OUT ABOVE. REPRESENTATIVE FOR KDBS GROUP?LLC d/b/a ELITE ROOFING OF ARKANSAS DATE: - i i °' � °p Patriot Bros Roofing ., 78 fiS1.947@, Insured: Van Buren City Library Properly: 1409 Main St Van Buren,AR 72956 Claim Number: Policy Number: Type of Loss: Date of Loss: Date Received: Date Inspected: Date Entered: 9/24/2024 11:19 AM Price List: ARFS8X_SEP24 Restoration/Service/Remodel Estimate: VB CITY LIBIURY i .till scope and unit costs presented here ore subject to correction,revision or modification pending further review, research,analysis and reinspection,as may be deemed necessary. Please adjust unit Labor Pricing to RFG.The default unit Labor Price in Xactimate is DMO.We are replacing a roof and the labor price needs to properly reflect the trade performing the repairs i Items changed from the original Scope of Loss have been bolded for easy comparison.Most changes will have an explanation,photo or code language directly attached to the line item explaining why it has been changed, € I I i 1 i r•� _. I f p 0 Patriot Bros Roofing 'A... VI3 CITY LIBRARY Roofing DESCRIPTION QUANTITY UNIT PRICE TAX RCV DEPREC. ACV 1. Remove Laminated-comp.shingle rfg.-w/felt 170.93 SQ 59.97 0.00 10,250.67 (0.00) 10,250.67 2. Laminated-comp,shingle rfg.-w/out felt 188.33 SQ 242.48 1,786.36 47,452.62 (0.00) 47,452.62 3. R&R Hip/Ridge cap-Standard profile-composition 287.95 LF 7.98 54,85 2,352.69 (0.00) 2,352.69 shingles 4. Rooting felt-synthetic underlayment 170.93 SQ 20.00 259.22 3,677.82 (0.00) 3,677.82 5. R&R Drip edge/gutter apron 1,120.67 LF 1.90 106.74 2,236.02 (0.00) 2,236.02 6. Step flashing 225.78 LF 9.77 34.04 2,239.91 (0,00) 2,239.91 7. Asphalt starter-peel and stick 1,120.67 LF 2.11 64,72 2,429.33 (0.00) 2,429.33 8. R&R Continuous ridge vent-shingle-over style 216.54 LF 5.00 76.01 1,158.71 (0.00) 1,158.71 9. R&R Flashing-pipe Jack 8.00 EA 56.85 11.30 466.10 (0.00) 466.10 10. R&R Chimney flashing-large(32"x 6011) 6.00EA 567.58 69.22 3,474.70 (0.00) 3,474.70 i l 1. R&R Furnace vent-rain cap and stonn collar,8" 3.00 EA 101.99 11.04 317.01 (0.00) 317.01 12, R&R Roof vent-turtle type-Metal 4.00 EA 74.23 7.19 304.11 (0,00) 304.11 1' 13, II&R Roof mount power attic vent 4.00 EA 547.87 50.10 2,241.58 (0,00) 2,241.58 14, R&R Counterflashing-Apron flashing 260.17 LF 10.60 40.59 2,798.40 (0.00) 2,798.40 15. R&R Flashing-L flashing-galvanized 19.69 LF 5.64 3.78 114.93 (0.00) 114.83 16. R&R Cap flashing-large 71.50 LF 28,90 108.05 2,174.40 (0.00) 2,174,40 Totals: Roofing 2,693.21 83,688.90 0.00 83,688.90 i Debris Removal 1 7 DESCRIPTION QUANTITY UNIT PRICE TAX RCV DEPREC. ACV ! 17. Dumpster load-Approx.40 ynrds,7-8 tons of debris 1.00 EA 798,31 59.87 858.18 (0.00) 859.18 Totals: Debris Removal 59.87 858.18 0.00 858.18 Line Item Totals: VB_C1TY_LIBRARY 2,743.08 $4,547.08 0.00 84,547.08 VB_CITY LIBRARY 9/26/2024 Page:2 i , I i Patriot Bros Roofing , Summary for Dwelling Line Ttem Total 81,804.00 Material Sales Tax 2,683.21 Subtotal 84,487.21 Service Sales Tax 59.97 Replacement Cost Value $84,547.08 Net Claim $84,547.08 s i i i� I i I I i i i 3 1 I i VB_CITY LIBRARY 9/26/2024 Page;3 i I i I i' to Patriot Bros Roofing ��n•enz•aeza Recap of Taxes Materlal Sales Cleaning Mad Service Soles Tax, imanuf.Home Storage Rental State Food Tax Local rood Tax Tax(7.5%) Tax(7.5%) (7.5%) Tax(6.5%) Tax(7.5%) (I.5%) (I%) Line Items 2,683.21 0.00 59.87 0.00 0.00 0.00 0.00 Total 2,683.21 0.00 59.87 0.00 0.00 0.00 0.00 r i i ;I 1 I(� I I 1 { I I VB CITY LIBRARY 9/26/2024 Page:4 I i I i a • . I i Tk�. ^��" b�RAp 6b, . Patriot Bros Roofing Recap J b Room Estimate:VB_CITY_LIBRARY Roofing 81,005.69 99.02% Debris Removal 798.31 0.98% Subtotal of Areas 81,804.00 100,00% I Total 81,804.00 100.00% i I i VB CITY LIBRARY 9/26/2024 Page:5 3 I I i ' 1 i i t i Patriot Bros Roofing �iseoss:oa�o. , Recap by Category Items Total % GENERAL DEMOLITION 12,990.19 15.36% HEAT, VENT&AIR CONDITIONING 2,358.99 2.79% ROOTING 66,454.82 78.60% Subtotal 81,804.00 96.76% Material Sales Tax 2,683.21 3,17% Service Sales Tax 59.87 0.07% Total 84,547.08 100.00"% I I i I 1 I VB_CITY LIBRARY 9/26/2024 Page:6 I I a®°A a a : oo• Patriot Bros Roofing bo JW& o_esa Sae Insured: Van Buren Senior Center Property: 18 Lafayette St Van Buren.AR 72956 Claim Number: Police Number: Type of Loss: Date of Loss: Date Received: Date Inspected: Date Entered: 9/23/2024 3:16 I'M Price List: ARPS8X_SEP24 Restoration/Scr v i ce/Remodel Estimate: VB SENIOR CENTER All scope and unit costs presented Itere are subject to correction,revision or modification pending further review, research,analysis and reinspection,as may be deemed necessary. Please adjust unit Labor Pricing to IIFG.The default unit Labor Price in Xactimate is DMO.We are replacing a roof and the labor price needs to properly reflect the trade performing the repairs Items changed from the original Scope of Loss have been bolded for easy comparison.Most changes will have all explanation,photo or code language directly attached to the line Item explaining why it has been changed. st `tt eo- r Patriot Bros Roofing =��T ■�O�l o:"; �2 t619•/G Vl3 SENIOR CENTER Dwelling Roof DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 1. Remove Laminated-comp.shingle rfg.- 144.56 SQ 59.97 0.00 1,733.86 10,403.12 (0.00) 10,403.12 w/felt 2. Laminated-comp.shingle rfg.-w/out 159.33 SQ 242.48 0.00 7,726.86 46,361 20 (0.00) 46,361.20 felt 3. R&R Hip/Ridge cap-Standard profile- 277.64 LF 7.98 65.23 456.16 2,736.95 (0,00) 2,736.95 composition shingles 4. Roofing felt-synthetic underlayment 144.56 SQ 20.00 270.38 632.32 3,793.90 (0.00) 3,793.90 5. R&R Drip edge/gutter apron 1,046.15 LF 1.90 122.90 422.12 2,532.70 (0.00) 2,532.70 6. Step flashing 239.33 LF 9.77 44.50 476.56 2,859.31 (0.00) 2,859.31 7. Asphalt starter-peel and stick 1,046.15 LF 2.11 74.51 456.38 2,738.27 (0.00) 2,738.27 8. R&R Continuous ridge vent-shingle- 270.001.13 5.00 116.88 293.38 1,760.26 (0.00) 1,760.26 over style 9. MR.Flashing-pipe jack 7.00 EA 56.85 12,20 82.04 492.19 (0.00) 492.19 10. R&R Flashing-pipe jack-split boot 1.00 EA 91.01 4.50 19.10 114.61 (0,00) 114.61 11. R&R Chimney flashing-large(32"x 2.00 EA 567.58 28.46 232.74 1,396.36 (0.00) 1,396.36 60") 12. R&R Flue cap-oversized 4.00 EA 294.08 91.27 253.54 1,521.13 (0.00) 1,521.13 13. R&R Countcrflashing-Apron flashing 108.60 LF 10.60 20.89 234.40 1,406.45 (0.00) 1,406.45 14. Ice&water barrier 229.54 SF 1.56 9.94 73.28 439.74 (0.00) 439.74 15. Remove Air conditioning unit,20 ton- 1.00 EA 628.70 0.00 125.74 754.44 (0.00) 754.44 Commercial grade D&R Roof units 16. Install Air conditioning unit,20 ton- 1.00 EA 4,750.00 0.00 0.00 4,750.00 (0.00) 4,750.00 Commercial grade D&R Roof units Totals: Dwelling Roof 861.66 13,218.48 84,060.63 0.00 84,060.63 Debris Removal DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCN' DEPREC. ACV 17. Dumpster load-Approx.20 yards,4 1.00 EA 603.48 66.98 120.70 791.10 (0.00) 791.16 tons of debris Totals: Debris Removal 66.98 120.70 791.16 0.00 791.16 Line Item Totals: VB_SENIOR_CENTER 928.64 13,339.18 84,851.79 0.00 84,851.79 VI3 SENIOR CENTER 9/26/2024 Page:2 ,o A Aoo 3 � I. Patriot Bros Roofing ,;rat�eRas . ROOFING'-. ;} ale-csz 9a9' Snmmary for Dwelling Line Item Total 70,583.97 Material Sales Tax 861.66 Subtotal 71,445.63 Overhead 6,669.59 Profit 6,669.59 Service Sales Tax 66.98 Replacement Cast Value $84,851.79 Net Claim $84,851.79 VB SENIOR CENTER 9/26/2024 Page:3 „r .. aadAPO + a. Patriot Bros Roofing {nrbf artos R100FINQ 4ta,esx Recap of Taxes,Overhead and Profit Overhead Profit(10%) Material Sales Cleaning Matl Service Sales Manuf.liome Storage State Food Local Food (10%) Tax(9.25%) Tax(9.25%) Tax(9.25%) Tax(6.5%) Rental Tax Tax(1.5%) Tax(2.75%) a (9.25/o) Line Items 6,669.59 6,669.59 861.66 0.00 66.98 0.00 0.00 0.00 0.00 Total 6,669.59 6,669.59 861.66 0.00 66.98 0.00 0.00 0.00 0.00 VII SENIOR CENTER 9/26/2024 Rage'4 1Pffi fUf >y Patriot Bros Roofing Recap by Room Estimate:VB_SENIOR_CENTER Dwelling Roof 69,980.49 99.I S%, Debris Removal 603.48 0.85% Subtotal of Areas 70,583.97 100.00% Total 70,583.97 100.000/o VB SENIOR CENTER 9/26/2024 Page:5 t ?f6bOC ; Patriot Bros Roofing �4)066D947B Recap by Category O&P Items Total % GENERAL DEMOLITION 11,485.78 13.54% FIREPLACES 1,097.76 1.29% ROOFING 53,250.43 62.76% O&P Items Subtotal 65,833.97 77.59% Non-O&P Items Total % HEAT, VENT&AIR CONDITIONING 4,750.00 5.60% Non-O&P Items Subtotal 4,750.00 .5.60% O&P Items Subtotal 65,833.97 77.59% Material Sales Tax 861.66 1.02% Overhead 6,669.59 7.86% Profit 6,669.59 7.86% Service Sales Tax 66.98 0.08% Total 84,851.79 100.00% V13 SENIOR CENTER 9/2612024 Page:6