RES NO 02-04-2024 CITY OF VAN BUREN,ARKANSAS
RESOLUTION NO.6A-4-2024
BE IT ENACTED BY THE CITY COUNCIL, FOR THE CITY OF VAN BUREN,
ARKANSAS,A RESOLUTION TO BE ENTITLED:
A RESOLUTION EXPRESSING THE WILLINGNESS OF
THE CITY OF VAN BUREN TO UTILIZE FEDERAL-AID
MONIES FOR THE FOLLOWING PROJECT: JEFFERSON
STREET BRIDGE REPLACEMENT OVER UNION PACIFIC
RAILROAD (STRUCTURE NO.01802).
WHEREAS, the City of Van Buren(hereinafter called the"City")understands Federal-aid funds
are available for certain local projects at the following Federal and City
participating ratios per project:
Type of Work Work Phase Federal Local Share
Share
Bridge Replacement All Phases 1 90% 10%
Projects designed but never All Right-of-Way 0% 100%
progressed to construction &Utilities 2
1.Non-reimbursable utility relocation costs will be borne solely by the owner of the utility company.
2.All utility(reimbursable and non-reimbursable)relocation costs will be bome by the City if the project does not
proceed to construction.
WHEREAS, the City is requesting the Arkansas Department of Transportation(hereinafter
called the "Department") make funding available to replace the Jefferson
Street Bridge(Structure No. 01802)over Union Pacific Railroad; and
WHEREAS, the Department has agreed to provide Federal-aid funds for ninety percent
(90%) of the costs for a feasibility study; and
WHEREAS, the Department will assign an on-call consultant to perform the feasibility
study,which will include preliminary engineering up to thirty percent(30%)
plans and development of a planning-level cost estimate; and
WHEREAS, upon completion of the feasibility study, the City will request additional
funding for future phases as needed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN
BUREN,ARKANSAS,THAT:
SECTION 1: The City will participate in accordance with its designated responsibilities in this
project.
SECTION 2: The Mayor,or their designated representative, is hereby authorized and directed
to execute all appropriate agreements and contracts necessary to expedite the
construction of this project.
SECTION 3: The City pledges its full support and hereby authorizes the Arkansas Department
of Transportation to initiate action to implement this project.
IN WITNESS WHEREOF,the Ci . of Van Burenf
Arkansas,by its City Council,
did pass, approve, and adopt,by a vote of for andagainst,the foregoing Resolution,
at its regular meeting held on the 26t'day of February
G\erk Trews
01 Ce
City of Van Buren Josep urst
Mayor
�^ ay
ATTESTED: ��'�. racy APPROVED AS TO FORM:
°County,At
Shawnna Reyn lds J cob How
City Clerk/Treasurer City Attorney
Of
Zr
NON
ARKANSAS DEPARTMENT OF TRANSPORTATION
POF
ARDOT.Sov ( IDriveArkansas.com I Lorie H.Tudor,P.E.,Director
KANSAS DEPARTMIENT 10324lnterstate30 I P.o.t3ox2261 I LittieRock,AR72203-2261 TRANSPORTATION Phone:501,569.2000 1 voice/rry7n I Fax:501.569.240o
January 26,2024
The Honorable Joe Hurst
Mayor of Van Buren
1003 Broadway
Van Buren,AR 72956 i
i
Dear Mayor Hurst:
Reference is made to the City's November 8,2023 request for funding through the Department's Local
Bridge Program for the replacement of the Jefferson Street Bridge (Structure No.01802) over Union Pacific
Railroad and the Flat Rock Creek Bridge(Structure No.17875)on Industrial Park Road in Van Buren. '
The Department has evaluated your request and determined that Structure No.01802,which is shown
on the enclosed map, is eligible for Federal-aid Off-System Bridge funding based on its functional classification
and structural condition. However, Industrial Park Road is classified as an Urban Major Collector. Therefore,
Structure No. 17875 is not eligible for Federal-aid Off-System Bridge funding through the Local Bridge Program.
In order to determine the scope and cost for the work,the next step will be the initiation of a feasibility
study. The feasibility study will include preliminary engineering up to 30 percent plan development and creation
of a cost estimate. Upon reviewing the result of the feasibility study and confirming that the estimated non-Federal
share of the project is acceptable, the City may request to proceed with the construction project utilizing
Federal-aid Off-System Bridge funding.
3
Before the.Department can proceed wifh.programming a Federal-aid project for the feasibility study,your-.
,It Council must pass a Resolution at tt prizing you to enter into agreements__yc bAb_e_Department for this project!
A sam leMhe
ion has been enclosed_for reference. Q_p6n receipt of the original signe an s�Tea e�
Resolutioepar men wl evelop a project agreement and assign State and Federal-aid'oi b nun
If you have any questions or would like additional information regarding this Department program,please
contact David Siskowski,Division Head—Local Programs,at(501)435-3255.
Sincerely,
Chi ngineer—Pre nstruc1 1.
Enclosures
c: Director Local Programs
Chief Engineer—Operations Program Management
Assistant Chief Engineer—Design Roadway Design
Assistant Chief Engineer—Maintenance State Aid ;
Assistant Chief Engineer—Program Delivery District 4
Bridge Reese Brewer,MPO Director,Frontier MPO
Bridge Operations
RESOLUTION NO.
A RESOLUTION EXPRESSING THE WILLINGNESS OF
CITY OF VAN BUREN
TO UTILIZE FIE'DE MONIES
FOR THE FOLLOWING PROJECT:
Jeffersonr Street Bi ttie Replacement over Union Aw fc Railroad
(Structure No. 01802)
WHEREAS,the City of Van Buren(hereinafter called the"City")understands Federal-aid funds
are available for certain local projects at the following Federal and City participating ratios per project:
Type Work Work Phase Federal Local Share
Share
Bridge Replacement All Phases' 90% 10%
Projects designed but never All Right-of-Way& 0% 100%
progressed to construction Utilities2
I Non-reimbursable utility relocation costs will be borne solely by the owner of the utility company.
?All utility(reimbursable and non-reimbursable)relocation costs will be borne by the City if the project does not
proceed to construction.
WHEREAS,the City is requesting the Arkansas Department of Transportation(hereinafter called
the"Department")make funding available to replace the Jefferson Street Bridge(Structure No.01802)over
Union Pacific Railroad;and
WHEREAS, the Department has agreed to provide Federal-aid funds for ninety percent of the
costs for a feasibility study;and
WHEREAS, the Department will assign an on-Cali consultant to perforni the feasibility study,
which will include preliminary engineering up to thirty percent plans and development of a planning-level
cost estimate;and
WHEREAS,upon completion of the feasibility study,the City will request additional funding for
future phases as needed.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN,
ARKANSAS,THAT:
SECTION I: The City will participate in accordance with its designated responsibilities in this
project.
SECTION II: The Mayor,or their designated representative,is hereby authorized and directed to
execute all appropriate agreements and contracts necessary to expedite the construction of this project.
SECTION III: The City pledges its full support and hereby authorizes the Arkansas Department
of Transportation to initiate action to implement this project.