Loading...
RES NO 03-03-1997 CITY OF VAN BUREN, ARKANSAS 0 RESOLUTION NO. 5- 3 -1997 ARESOLITTION ACCEPTING BiDS FOR THE NORTHSIDE DRAINAGE IMPROVEMENT PROJECT. WFIEREAS, The City is ready to begin construction of drainage improvements desi- gnatcci as the Northside Drainage Improvement Project; and, WHEREAS, The City advertised and received bids for the construction of such drainage improvements; and, WHEREAS, One the date and time publicized, Lids were opened; and, WHEREAS, The City Council feels that the bid made by Forsgren, Inc. of Fort Smith, Arkansas for the amount of $909,730.00 for the entire project, based on their unit prices, is the lowest and hest bid. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF VAN BUREN, ARKANSAS: SECTION 1: That the hid of $909,730.00, made by Forsgren, inc., for the entire project, based on their unit pricing, is the lowest and best bid and is hereby accepted, with the condition that the City is authorizing Change order No. 1 and is agreeing to pay Forsgren, Inc. up to $506,166.45 for the completion of the project as set out in the proposed contract with Change Order No. 1. Said change in the project does not affect the positions of the kidders herein. SECTION 2: The Mayor and City Clerk- Treasurer are hereby authorized to enter into an agreement with Forsgren, Inc. for up to the amount $506,166.45 for the completion of such project. 0 PASSED AND APPROVED THIS 17TH DAY OF MARCH 1997. 0 a MAYOR 4 ATTESTED: CIT4 .Isl K T Z _a.r1f'I LL el Ill HAWKINS -WEIR ENGINEERS, INC. s r GINEERS- SURVEYORS RONALD R. HAWKINS, P.E., R.I.S. March 10, 1997 C. LARRY WEIR, P.E. BARRY K. McCORMICK, P.E. BRETT D. PETERS, P.E. RONNIE L KEENER, P.E. STEVEN R. HENDRIX KEITH W. KESTNER, E.I., L.S.I.T. Honorable John Riggs Mayor, City of Van Buren 1003 Broadway Van Buren, Arkansas 72956 Re: Northside Drainage Improvements HWEI Job No. VB9674 Dear Mayor Riggs: Attached is a copy of the advertisement for bids and a certified tabulation for bids received on February 6, 1997, for the referenced project. The low bid was from Forsgren, Inc. of Fort Smith with a bid of $909,730.00. It is our opinion that the bids received are competitive and reflect the cost of constructing this project in todays marketplace. Therefore, we recommend the City award the contract to Forsgren, Inc. Attached is a copy of the contract for your signature. Due to budget constraints it was decided by the City to delete all work South of Rena Road. Change Order No. 1 reflects these changes and reduces the contract price from $909,730.00 to $506,166.45. The contractor is in agreement with these changes. Attached is a copy of Change Order No. 1 for your signature. If you have any questions or comments, please advise. Very truly yours, HAWKINS -WEIR ENGINEERS, INC. iff %10/2/t.__ Ronnie L. Keener, P.E. RRH/wmh Enclosures: 1) Advertisement for Bids 2) Bid Tabulation 3) Contract 4) Change Order No 1 '1019 POINTER TRAIL VAN BUREN, ARKANSAS 72956 FAX (501) 474-8531 PHONE (501) 474 4227• EMAIL hawkweircgipa.net